4) Carefully remove the quartz sleeve from the chamber. As you first pull the

sleeve, support the far end with your finger so that it does not drop to the bottom
of the chamber as it starts moving

5) Once removed, clean the quartz sleeve with alcohol or a detergent. Stubborn

stains can often be removed with a dilute solution of hydrochloric acid.

Follow all manufacturers’ instructions and precautions when handling
cleaners and chemicals.

6) Reassemble in the reverse order. While inserting, keep the quartz sleeve

parallel to the chamber, and as it nears the far end support with your finger.
Make sure the quartz sleeve protrudes an equal distance at each end. Be sure
that the O-rings are placed on the sleeve before the Teflon washer.

Tighten the static gland nuts firmly by hand only. Using hands tools can
easily break the quartz sleeve.

7) Prior to installing the lamp, connect the water supply and check for leaks. When

any leaks have been remedied, then install the lamp and connect the power
supply.

Germicidal ultraviolet rays are harmful to eyes and skin. Do not restore
power until lamp and end caps have been completely reinstalled.

WARNING

CAUTION

WARNING

Summary of Contents for VMS-3

Page 1: ...Ultraviolet Systems VMS 3 Installation Operation Maintenance VMS 3 Part Number 95 0031...

Page 2: ...in injury to personnel or loss of life Text formatted in this manner concerns an operating procedure or practice that if not strictly observed can result in damage to or destruction of equipment MODEL...

Page 3: ...fore performing any maintenance Avoid exposure to direct or strongly reflected germicidal ultraviolet rays Germicidal ultraviolet rays are harmful to the eyes and skin The VMS 3 is intended for use wi...

Page 4: ...use and after other water devices such as de ionizers water softeners carbon filters prefilters RO units storage tanks pressure tanks and pumps This reduces the chance of purified water being re cont...

Page 5: ...ast includes a LED indicator light that confirms the UV bulb is functioning VMS 3 12VDC comes with two wire leads from the ballast to be connected to a 12 Volt supply This version does not have any in...

Page 6: ...02 Quartz Sleeve 33 5003 Lamp Socket Ballast 110V 33 5007 Lamp Socket Ballast 220V 33 5008 Lamp Socket Ballast 12 VDC 33 5009 O Ring Static Gland two required 33 5004 Static Gland Nut two required 33...

Page 7: ...lacement on a 10000 hour or one year interval and cleaning the quartz sleeve when conditions warrant Lamp Installation or Replacement 1 Disconnect power to the UV and remove the ground connector if eq...

Page 8: ...4 Carefully remove the lamp from the chamber by pulling straight out without angling Reinstall in the reverse order Germicidal ultraviolet rays are harmful to eyes and skin Do not restore power until...

Page 9: ...t and outlet ports of the chamber If possible drain all water from the chamber 2 Unscrew the static gland nuts from each end of the chamber Avoid striking the quartz sleeve with the static gland nut 3...

Page 10: ...e order While inserting keep the quartz sleeve parallel to the chamber and as it nears the far end support with your finger Make sure the quartz sleeve protrudes an equal distance at each end Be sure...

Page 11: ...through the chamber being careful to remove all quartz fragments from possible contamination of your water supply Disposal of Mercury Added Lamps Germicidal ultraviolet lamps like standard fluorescen...

Reviews: