
Mounting
HLR Mounting Instruction
28
192-510201N1 HLR 2019-04
Carefully insert the gearbox drive shaft into the pulley of the HLR linear actuator.
The drive shaft must be easy to insert. Clamping area between pulley and gear
shaft must be free of oil and grease!
Screw in the screws (see Figure 5, Pos. 6) and place them lightly against the
gear flange (do not tighten).
Please take care that the carriage will not be moved during the installation of the
drive. It is possible that the clamping slots are not longer aligned when moving
the carriage. This may reduce clamping force.
Tighten the clamp collar to the required tightening torque using the clamping
screw on the face side through the bore of the deflection station (see Table 5).
Tighten flange screws crosswise with the respectable tightening torque (see
HLR070
HLR080
Tightening torque clamp collar (please refer to Figure 5, Pos. 3)
Screw type [ISO 4762]
-
M5 x 14 – 10.9
M6 x 20 - 10.9
Tightening torque
[Nm
]
6.0
15.0
Tightening torque gear screws (please refer to Figure 5, Pos. 5
Screw type [ISO 4762]
M4x8 – A2-70
M5x10 – A2-70
Tightening torque
[Nm
]
2.1
4.0
Tightening torque drive flange (please refer to Figure 5, Pos. 6)
Screw type [ISO 4762]
-
M4 x 16 – A2-70 / 8.8
M5 x 14 – A2-70 8.8
Tightening torque
[Nm
]
2.1
4.0
Table 5: Tightening torques and screws for drive assembly
3.6
Assembly of Z-axes
In the following subchapters, the assembly of predefined Z-axes with optionally
available connection plates is described.
Connection of further Z-axes or other mechanical components is possible by the
customer via the mounting threads in the carriage.
The rods of the ETH / ETT cylinder and the profile of the OSPE linear actuator
are not self-locking!
Make sure that the piston rod or the profile of the OSPE actuator is secured,
especially in vertical alignment of the ETH / ETT cylinder!
Make sure that you always transport or lift the Z-axis in a safe manner and with
the aid of suitable lifting equipment (means of transport).
The maximum permissible loads or torques (rollers, pitch, yaw) of the HLR linear
actuator (see technical data in the HLR catalogue) must not be exceeded. Please
consider the entire load: Weight of the Z-axis, including motor/gear, additional
loads and all application forces.
Make sure all screws are tightened before operation.
We recommend to secure all screws with a liquid screw lock (e.g. Loctite 242).
In this chapter you can read about:
Mounting ETH/ETT032 on single axis via bracket plate ................................................... 29
Mounting ETH/ETT032 & ETH/ETT050 on double axis via cross beam ........................... 31
Assembly of OSP-E20BV to single axis via mounting plates ............................................ 33
Summary of Contents for HLR Series
Page 6: ...Introduction HLR Mounting Instruction 6 192 510201N1 HLR 2019 04 1 3 Mounting explanation...
Page 14: ...Device description HLR Mounting Instruction 14 192 510201N1 HLR 2019 04...
Page 15: ...Parker EME Conditions of utilization 192 510201N1 HLR 2019 04 15...
Page 16: ...Device description HLR Mounting Instruction 16 192 510201N1 HLR 2019 04 2 1 Technical data...
Page 17: ...Parker EME Dimensions 192 510201N1 HLR 2019 04 17 2 2 Dimensions...
Page 18: ...Device description HLR Mounting Instruction 18 192 510201N1 HLR 2019 04...
Page 19: ...Parker EME Dimensions 192 510201N1 HLR 2019 04 19...
Page 54: ...Index HLR Mounting Instruction 54 192 510201N1 HLR 2019 04...
Page 55: ...Parker EME Spare and Wear Parts 192 510201N1 HLR 2019 04 55...
Page 56: ...Index HLR Mounting Instruction 56 192 510201N1 HLR 2019 04...