Refrigerating Specialties Division
7
R/S Defrost Controller Wiring Diagram
CK-2D/CK-6D Line Equilization, S4AD Soft Start
R/S Adjustable Time Delay Wiring Diagram
Valve Sequencing - Line Equalization on Opening
Page 1: ...operated dual position valve This valve is equipped with a manual opening stem and A2D pressure pilot The CK 6D is a normally open valve and will open remain open if open on power failure or open to...
Page 2: ...ons The main valve will open to it s intermediate position however since residual pressure in the coil is transmitted through the pilot regulator to the top of the top piston Note The pilot regulator...
Page 3: ...e as stamped on coil The supplycircuitsmustbeproperlysizedtogiveadequate voltage at the coil leads even when other electrical equipment is operating The coil is designed to oper ate with line voltage...
Page 4: ...Refrigerating Specialties Division 4 CK 2D Fig 2...
Page 5: ...Packing Kit 1 202100 202101 21 Solenoid Tube O 1 10 Gasket Adapter 1 29 Seat 1 11 Piston Top 1 29 31 Plunger Seat Kit 1 204707 204707 204707 204707 12 Spacer Piston 3 3 6 10 16 21 25 Gasket O ring Ki...
Page 6: ...0 2 500 4 19 7 139 7 5 5 251 9 9 198 7 8 234 9 2 371 14 6 307 12 1 15 0 6 38 1 5 65 2 5 528 3 20 8 142 2 5 6 251 9 9 224 8 8 246 9 7 401 15 8 331 13 25 1 43 1 7 75 3 624 8 24 6 216 8 5 311 12 2 257 10...
Page 7: ...igerating Specialties Division 7 R S Defrost Controller Wiring Diagram CK 2D CK 6D Line Equilization S4AD Soft Start R S Adjustable Time Delay Wiring Diagram Valve Sequencing Line Equalization on Open...
Page 8: ...person is authorized to give any warranties on behalf of Refrigerating Specialties nor to assume for Refrigerating Specialties any other liability in con nection with any of its products Safe Operati...