INSTALLATION & MAINTENACE MANUAL
RCOe2100/03.06
31
Vertical
Installation with
output
shaft
downward
Any drain port can be used.
Vertical
Installation with
output
shaft
upward.
Use one of the two drain ports and make sure that, before reaching tank, the pipe gets
above the motor installation flange level, so that the two bearings lubrication is ensured.
On request, the motor can be supplied with an optional purge (T1) on the front cover.