CHECK VERTICALS WITH CARPENTERS LEVEL
CROSS CHECK LEVEL
STAKES TO
POSITION
BOTTOM RAILS
CHECK LEVEL
HARD
BOARD
475mm
475mm
475mm
GENERAL VIEW
27. Check opposite corner to corner
measurements.
29.
Note:
It is Imperative that there is a
solid concrete square behind skid member.
30. If the plates are installed on soft fill
the weight of water can make the
vertical shift out of level. If in doubt
pack a small batch of concrete under
plate. (17)
28. Your pool is now ready to concrete.
Check vertical levels before concrete
hardens and pour concrete into
excavated hole to ground level.
31. Place the required amount of Sand
inside the pool.
LIDO POOL
26. Check corner to corner measurements
as per ground plan. The measurement
should be the same to have the frames
square.
Summary of Contents for 161248
Page 1: ...LIDO INGROUND OR INDECK POOLS OVAL POOL INSTRUCTION MANUAL...
Page 2: ...LIDO POOL A few important safety hints Enjoy Your Swimming Safely...
Page 10: ...LIDO POOL ASSEMBLE FRAMES FOR POOLS...
Page 19: ...Takapuna 11 Barrys Point Rd Takapuna Auckland 0622 Email northshore paramountpools co nz www...