MDX² VINYL INSTALLATION
6
LINER
POOL BASE
CONCRETE FOOTING
MDX² Plumbing (Fig. 1)
1.
Position the MDX² Sump even with the finished
depth of the pool, spa or basin
(Fig. 1)
.
Whichever pool base is used, the drain sump must
be encased in concrete as shown to anchor it in
place
2.
Position the REQUIRED SDX High Flow Safety
Drain on a sidewall of the pool below water level (if
pool will be winterized, place it high enough to
reach from the deck). Option: The SDX High Flow
Safety Drain may be positioned on the floor a
MINIMUM of three (3) feet away from any other
Suction Outlet.
Fig. 1
Pool Base Install
Finish pool base even with upper edge of MDX²
sump
(Fig. 1)
.
Liner Install
1.
Make sure bottom gasket is in place before
installing liner.
2.
Set liner in pool and draw tight with vacuum.
3.
Install top gasket, seal ring and 12 screws.
4.
Cut out liner inside of sump. Be sure to trim liner
right up to the inside diameter of seal ring.
Hydrostatic Fitting
The hydrostatic port inside the MDX² Sump is
equivalent to a 2" Threaded Female Adapter and a 2"
Slip Fitting Outside the MDX² Sump. Paramount
recommends the use of the 2” thread plug provided. Do
not use check valves here that are prone to sticking
open causing the need to open the drain cover
exposing a suction risk. This port is for the purpose of a
hydrostat only. If a hydrostat is not used, plug this port
from bottom with pipe and cap. Do not install any
suction equipment (pump) to this port
SDX VINYL INSTALLATION
1.
Select the installation location for the SDX drain. (Additional SDX drains may be used.)
2.
For Steel Wall:
Make one 4½" hole using a Greenlee
®
Standard Round Knockout Punch (Greenlee.com - Cat.
No. 742BB / UPC No. 19978)
For Plastic Wall:
Cut one 4½" hole using a 4½" hole saw.
For Concrete Wall:
Embed one SDX Bulkhead fitting. Protect vinyl liner mounting surface from concrete and
align the back of the flange with the interior surface to allow room for rolled foam around the fitting.
3.
Install the SDX Bulkhead Fittings with the “UP” arrow located at the top.
(Fig. 2)
a.
Discard the Solid Gasket used for fiberglass shells.
b.
Mount the SDX Bulkhead Fittings in the wall with the UP arrows at the top.
c.
Secure with the SDX Nut. (Not needed for concrete walls.
Assemble the Drain PRIOR to adding water:
1.
Install lower support (#8) onto sump (#12) with
4 (four) security screws (# 6 and #7) with
screw driver security T25 (#21).
2.
Install upper support (#5) onto lower support
(#8) and secure with 8 (eight) security screws
(#4).
3.
Install the cover (#3) onto the upper support
(#5) and secure with 6 (six) phillips screws (#2)
and 2 (two) phillips screws (#1).
For technical assistance call 1-800-621-5886 or contact your regional representative.