background image

5

PRE-PLASTER DETAIL | SMOOTH BODY INSTALLATION

1.  Make a cutout or opening approximately 1" 

deep and 1" bigger than the pipe. This cutout 
will be filled with plaster or other finish coat to 
create a water stop.

2.  Cut off riser pipes flush with concrete 

surface.

3.  Remove cap. Prime the inside of the pipe. 

DO NOT PRIME THE BODY.

4.  Glue the body into the pipe with a regular 

PVC glue.

The glue must cover the full length of the body 
barrel and 3” deep inside the riser pipe. Push 
the body into the pipe until the shoulder hits the 
top edge of the pipe.

Let fumes vent for 30 minutes then replace all 
body caps.

5.  PLASTERING THE POOL 

Leave all plaster caps in place for removal at 
start up.

NOTE: Optional, the plaster crew may remove 
the plaster caps as they finish.

NOTE: The body does not come with the 
nozzle installed.

NOTICE: You can use regular PVC glue on smooth body

SOIL

CONCRETE

Summary of Contents for ECO POOL 006-527-6316 Series

Page 1: ...80 893 7607 Fax 480 753 3397 Paramount 1Paramount com www 1Paramount com US and Foreign patents and patents pending see www 1paramount com support patent numbers Paramount products are designed by Par...

Page 2: ...zle Tool ECOPOOL SMOOTH BODY SYSTEM Item Number 006 527 6316 XX Includes 1 Two Port Four Gear Valve 3 Smooth Bodies with Cap 3 Nozzles 3 Riser Pipes 1 Nozzle Tool Please indicate your color choice by...

Page 3: ...2 2 COMESIN FROMFILTER 3 MINIMUM R R R 1 1 1 2 2 2 2 2 R R R 2 COMESIN FROMFILTER 3 MINIMUM R R R MIN 3 1 1 1 2 2 2 1 1 1 2 2 2 R R R VALVE PLUMBING SCHEMATIC 2 PORT WATER VALVE 1 Floor 1 2 Wall 2 Not...

Page 4: ...Thread the pressure gauge to the top of the dome Do Not Use Teflon Tape 11 Pressurize with pool plumbing do not exceed 35 psi 12 Store the module assembly in a safe place and install after the pool h...

Page 5: ...y into the pipe with a regular PVC glue The glue must cover the full length of the body barrel and 3 deep inside the riser pipe Push the body into the pipe until the shoulder hits the top edge of the...

Page 6: ...IN THE PIPE 4 Glue the body into the pipe with a HEAVY BODY PVC SOLVENT CEMENT The glue must cover the full length of the body barrel and 3 deep inside the riser pipe Push the body into the pipe until...

Page 7: ...ed under the Multi port Tube Assembly Figure 1A on the Module must be centered over the open ports in the Base Figure 2A Figure 1 2 Port Module Figure 2 Base Figure 2A Ports Figure 1A Multi port Tube...

Page 8: ...ule and let valve cycle to flush out any debris remaining in each line 2 Be sure o ring is pushed all the way up to top flange 3 Start with nozzle closest to the valve make sure the red plaster caps h...

Reviews: