background image

 

 

www.parametric.ch/product/pcr2-od

 

Installation Instructions 

 

1 Electrical Installation 

 

 

 

Connect the mains (AC) supply in compliance with national regulations (VDE0100 and 

EN50178) 
 

Before closing the casing, make sure that the two components are aligned as depicted. 

 

The cable gland and the antenna are pointing downwards. 

 

Ensure that the cable gland is fully tightened. 

 

 

Reviews: