background image

 

 

 

 

3.

 

Safety Information 

 

3.1

 

  General Safety Information 

 

 

 

Only  trained  and  authorised  personnel  should  be  permitted  to  work  on  this  equipment.  It  is 
assumed that those using this guide are competent to work on equipment of this nature and will 
take appropriate precautions when working with the fault analysis guide. 
 
All devices should be inspected upon receipt for signs of physical damage, which may in turn, affect 
operational performance, or the overall safety of the unit.  Any damaged items should be returned 
to Parallax Digital Technologies Ltd for safety checks. 
 
Parallax Digital Technologies accepts no responsibility for any injury or loss caused by unsafe or 
inadequate working practices, or for work carried out by an unauthorised third party. 
 
To  prevent  possible  danger,  damage,  and  bodily  harm  when  handling  the  equipment,  please 
observe  all  warnings,  cautions  notices  contained  in  this  section.  Failure  to  heed  the  following 
danger, warnings, and cautionary statements could lead to serious injury or death. 

 

3.2

 

  DC Power Supply 

 

 

 

The Unit should be mains-fed using a DC Power Supply using an appropriately rated cable 
assembly, which is protected internally at the power supply device itself.  If the device is to be fed 
from an alternative power source, then the appropriate circuit protection device should be used 
to ensure that the supply circuit is interrupted, in the event that a fault in the device causes too 
much current to flow into it, causing an unsafe condition. 

 

4.

 

Packing List 

 

The following items are included in the shipping carton: 

 

1 x PDT-NSU-0008-MP-I Unmanaged Ethernet Switch 

 

1 x DIN Rail Mounting Kit (Fitted) 

 

1 x Wall Mounting Kit 

 

Operation & Maintenance Manual (May be electronically supplied) 

 

Declaration of Conformity (May be electronically supplied) 

 

 

Summary of Contents for PDT-NSU-0008-MP-I

Page 1: ...Operations Manual PDT NSU 0008 MP I Revision 1 0 March 2023...

Page 2: ...5 6 Connectors and Indicators 6 6 1 LED Indicators 6 6 2 RJ45 Ports 6 6 3 Power Supply Connector 7 6 4 PoE Compatibility 7 6 5 PoE Power Budget 7 7 Installation Procedures 8 7 1 DIN Rail Installation...

Page 3: ...1 Revision History Date Rev By Comments Checked Date 09 03 2023 01 JF Initial Release SC 09 03 2023...

Page 4: ...ption AP Access Point CCA Copper Clad Aluminium DC Direct Current IEEE Institute of Electrical and Electronic Engineers IP Internet Protocol MTBF Mean Time Between Failures PD Power Device PoE Power o...

Page 5: ...and bodily harm when handling the equipment please observe all warnings cautions notices contained in this section Failure to heed the following danger warnings and cautionary statements could lead to...

Page 6: ...IP Telephones etc This model operates from a nominal 48VDC power supply but can utilize supplies in the range 48 57VDC The device is designed for use in harsh industrial environments and incorporating...

Page 7: ...connections as indicated in the table below LED Name Colour State Status PWR Power Green OFF Unit Power Off ON Unit Power On T1 8 Link Activity Green OFF No Connection Flashing Connection FX1 2 Not Us...

Page 8: ...meet the required output current for the device plus any PoE powered device requirements 6 4 PoE Compatibility Model No IEEE 802 3af IEEE 802 3at IEEE 802 3bt PDT NSU 0008 MP I The PoE output for this...

Page 9: ...e switch to the required surface using appropriate fixings 7 Installation Procedures 7 1 DIN Rail Installation 7 2 Wall Mount Installation Attach the DIN Rail Bracket if not fitted to the switch case...

Page 10: ...onnections Ensure all required RJ45 Ports are connected correctly using CAT5e cable or better to the client devices The Uplink port should be connected to the host device or network and the access por...

Page 11: ...ng Rate 14 88Mbps INTERFACE Wired 8 x 10 100 1000 PoE RJ45 PoE Standard IEEE 802 3af 802 3at Port RJ45 Power Pin Assignment 4 5 7 8 PoE Budget 240W ENVIRONMENTAL Operating Temperature 40 C to 80 C Sto...

Page 12: ...tic Discharge EN 61000 4 2 2009 Electromagnetic Field Immunity EN 61000 4 3 2010 Electrical Fast Transients EN 61000 4 4 2012 Surge EN 61000 4 5 2014 A1 2017 Conducted Immunity EN 61000 4 6 2014 Power...

Reviews: