background image

 8

2. Enter the Node IP Address and Node Subnet Mask.

3. Select Create a Dedicated Network Management Link, and enter a DLCI, VPI, and

VCI at the ensuing prompts. The Management Link that is created will be used by
the NOC to access the unit.

4. If the Ethernet port will be used, select the Ethernet Port Options Screen. Enable

the interface. Respond Yes to the prompt 

Would you like to set the

Node’s Default IP Destination to Ethernet?

 and configure the

following:

– Enter the IP address and subnet mask for the Ethernet interface.
– Enter the Default Gateway Address (the IP Address that will be used for packets

without a route).

– Press the ESC key to return to the Easy Install screen.

5. The Network 1 FRF.8 Encapsulation Mode default setting is Translation.

Encapsulation Translation used for carrying multiple upper layer user protocols
(frame relay PVC and ATM PVC).

Modify to Transparent to use SLV and multiplexed PVC functions.

6. Save the configuration.

7. Install the network cable (see 

Connecting to the Network on page 10).

8. Optionally, install the Ethernet cable (see 

Connecting to the Ethernet on page 11).

9. Install the DTE cable (see 

Connecting to the DTE (Router or FRAD) on page 12).

Physical installation of the unit is complete; the NOC can now remotely access the unit
for additional configuration.

Summary of Contents for FrameSaver DSL 9783 CSU/DSU

Page 1: ...Reference To order a paper copy of a Paradyne document Within the U S A call 1 800 PARADYNE 1 800 727 2396 Outside the U S A call 1 727 530 8623 Upgrading a Basic Unit to SLV Full SLV capability can b...

Page 2: ...ccess cable with 6 pin connector FrameSaver DSL 9783 Quick Reference Document No 9783 A2 GL10 Be sure to register your warranty at www paradyne com warranty Before You Install the FrameSaver DSL Unit...

Page 3: ...32 straight through cable 8 pin modular to DB25 14 feet 4 3 meters 3100 F2 540 035 0314 1431 PC with a D Sub9 interface connector Standard EIA 232 straight through cable D Sub9 to DB25 14 feet 4 3 met...

Page 4: ...supply into the grounded power outlet and check the LEDs If any LEDs light you have power If not refer to Troubleshooting in the User s Guide for possible explanations 3 Insert the self mounting tie...

Page 5: ...top bit set to 1 Flow Control set to None 2 Insert the DB25 end of the EIA 232 cable into the FrameSaver unit s COM port COM Port 00 16685 01 ETHERNET P O R T COM POWER NET VT100 Terminal or PC 3 Inse...

Page 6: ...o see a visual representation of the menu levels see Menu Hierarchy in the Quick Reference Tab key or Up Down Left and Right Arrow keys Move the cursor from one menu item to the next Enter or Return k...

Page 7: ...DSL Installation An Easy Install screen is provided for custom configurations but is not required for normal installation Procedure To use the Easy Install screen 1 Select the Easy Install feature Ma...

Page 8: ...way Address the IP Address that will be used for packets without a route Press the ESC key to return to the Easy Install screen 5 The Network 1 FRF 8 Encapsulation Mode default setting is Translation...

Page 9: ...is functioning see Verifying the End to End Path on page 13 6 Verify that data is being received see Checking That Data is Being Received on page 15 7 Using the OpenLane VC Provisioning Application or...

Page 10: ...sert the other end of the cable into the modular jack labeled NET DSL Network 00 16685 01 ETHERNET P O R T COM POWER NET 3 Verify that the Network signal DSL LED is green If so the network interface i...

Page 11: ...LAN where the NMS resides 00 16687 01 NMS LAN ETHERNET P O R T COM POWER NET 3 Check Health and Status messages in the left column of the System and Test Status screen to verify that there are no Eth...

Page 12: ...rectly and it is operational If not make sure both ends of the cable are properly seated and secured 5 Check Health and Status messages in the left column of the System and Test Status screen for mess...

Page 13: ...ill be sent Specify the Initial Route Destination for the Trap Manager s Select desired trap categories 3 Save the configuration 4 Return to the Main Menu Verifying the End to End DSL Provider Managem...

Page 14: ...number for the uplink VP to be used by these custom connections must be specified on the Max VCI per VPI screen and the apply changes executed For ATM line cards custom connections can be used to exp...

Page 15: ...ections to verify that all PVCs including management PVCs are configured and to see whether the PVC is active or not Procedure 1 From the FrameSaver DSL 9783 Main Menu select PVC Connection Status The...

Page 16: ...in which it is installed If necessary consult with the appropriate regulatory agencies and inspection authorities to ensure compliance 7 A rare phenomenon can create a voltage potential between the e...

Page 17: ...be coordinated by a representative designated by the supplier Any repairs or alterations made by the user to this equipment or equipment malfunctions may give the telecommunications company cause to...

Page 18: ...ommunications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense The autho...

Page 19: ...ll 1 727 530 2340 Document Feedback We welcome your comments and suggestions about this document Please mail them to Technical Publications Paradyne Corporation 8545 126th Ave N Largo FL 33773 or send...

Reviews: