
8. Testing
8-8
March 2001
3160-A2-GB24-10
Local Loopback Tests
The Local Loopback tests enable you to conduct circuit testing and fault isolation
for the digital line. The supported local loopback tests are:
Line Loopback (LLB)
Payload Loopback (PLB)
DTE Loopback (DLB)
Repeater Loopback (RLB)
Data Channel Loopback (DCLB)
Data Terminal Loopback (DTLB)
NOTE:
DLB does not appear when the DTE Drop/Insert (DSX-1) interface is disabled.
The Line Loopback command can be activated and deactivated in response to
commands received over the network interface. The Network Interface
configuration option NET LLB controls whether the DSU/CSU responds to the
commands transmitted on the network interface to initiate LLBs (see
Appendix C,
Configuration Options
).
The data port configuration option NET DCLB controls whether the DSU/CSU
responds to inband V.54 commands to initiate DCLB for that port (see
Appendix C,
Configuration Options
).
Local loopback tests can be aborted (Abort Command) at any time.
No more than two local loopbacks can be active at any one time. An additional
restriction prohibits certain loopbacks from running at the same time. Valid
loopback combinations listed in
Table 8-2, Valid Loopback Combinations
, are
identified by YES.
Table 8-2.
Valid Loopback Combinations
LLB
PLB
DLB
RLB
DCLB
DTLB
LLB
N/A
NO
YES
YES
NO
YES
PLB
NO
N/A
YES
NO
NO
YES
DLB
YES
YES
N/A
NO
YES
YES
RLB
YES
NO
NO
N/A
NO
YES
DCLB
NO
NO
YES
NO
YES
(on separate ports)
YES
(on separate ports)
DTLB
YES
YES
YES
YES
YES
(on separate ports)
YES
(on separate ports)
Summary of Contents for 3160-A4
Page 14: ...Contents viii March 2001 3160 A2 GB24 10 ...
Page 18: ...About This Guide xii March 2001 3160 A2 GB24 10 ...
Page 26: ...1 Introduction 1 8 March 2001 3160 A2 GB24 10 ...
Page 38: ...2 Installation 2 12 March 2001 3160 A2 GB24 10 ...
Page 54: ...3 Using the Front Panel 3 16 March 2001 3160 A2 GB24 10 ...
Page 102: ...4 Configuration 4 48 March 2001 3160 A2 GB24 10 ...
Page 110: ...5 Security 5 8 March 2001 3160 A2 GB24 10 ...
Page 162: ...8 Testing 8 24 March 2001 3160 A2 GB24 10 ...
Page 164: ...A Front Panel Menu A 2 March 2001 3160 A2 GB24 10 ...
Page 222: ...D Configuration Worksheets D 14 March 2001 3160 A2 GB24 10 ...
Page 240: ...E Pin Assignments E 18 March 2001 3160 A2 GB24 10 ...
Page 272: ...F SNMP MIB Objects F 32 March 2001 3160 A2 GB24 10 ...
Page 280: ...G IP Network Addressing Scenarios G 8 March 2001 3160 A2 GB24 10 ...
Page 300: ...J Equipment List J 2 March 2001 3160 A2 GB24 10 ...