14
July
2005
IPD1-A2-GZ40-10
7. Verify the connection. Turn your power source(s) on. The PWR (power) LED
on the interface module and management module faceplates will illuminate
solid green to indicate the modules are receiving power.
Establishing Your Uplink Connections
No configuration is necessary for Uplink Interface Modules (UIMs) or Media
Interface Modules (MIMs) installed on the management module(s) in your 12000E
to operate at default settings. However, if you wish to run your uplink connections
at settings other than the UIM or MIM defaults, configure the UIM or MIM prior to
connection.
For further connection and configuration information, refer to the installation
instructions of your particular UIM or MIM.
MANAGEMENT MODULE
INTERFACE
MODULE
Power LED
Power LED
Uplink Module