background image

Step 3 – Installation

Installing to a permanent surface:

Installing in the ground:

Preparing the holes

Protecting the exhibit base

Setting the exhibit base

Finishing the installation

Pannier Exhibit Base

Page 2 of 2

Move all assembled Exhibit Bases, tools and materials to 
the installation site. Mark the installation location using 
stakes or approved marking paint to indicate pedestal base 
locations. Prior to installation, please check the local 
building and signage codes as well as the applicable ADA 

(Americans with Disabilities Act) regulations for 
compliance.

When installing the exhibit base with attached base plates 
to a permanent surface, such as concrete, use the 

appropriate fastening devices to provide a secure and 
permanent installation.

When installing the pedestal in the ground, you will need 

to dig holes approximately 6” below the local frost line. We 
recommend that you plan your installation depth to allow 

for approximately 28” to 32” distance between the ground 

surface and the bottom of the exhibit frame assembly 

when finished.

Fill the completed holes with approximately 6” of gravel 
and tamp to provide an even and firm surface.

To prevent concrete splatter from attaching to the 

pedestal base(s), wrap and secure plastic to the upper 
portion of the pedestal base(s) to protect any part which 
will be seen after installation.

Set the exhibit base in the ground, level the uprights by 

securing with temporary braces and clamps as shown in 
Figure 3. Double-check the distance from the ground 

surface to the exhibit frame for proper height.

Mix and fill the holes with wet cement to within 2” of the 
ground surface. Agitate the concrete to remove air 

pockets making sure to not bump or move the braced 
exhibit base. Carefully recheck the base level before the 

concrete begins to harden.

Let cement set for at least 24 hours, remove the plastic 

and braces, back fi ll remaining holes and finish as 
necessary.

C-Clamp

Level

Backfi ll

28”-32”

Concrete

Gravel Base

Panel Assembly

Plastic 

Protection

Wood Braces

Figure 3

Assembly and Installation Instructions

FORM # SDINST

REV 02.01.15

345 Oak Road

Gibsonia, PA 15044
724.265.4900
[email protected]

www.PannierGraphics.com

Reviews: