V00028CA Rev03
www.panduit.com
Page
17
of
18
50.
Complete the installation and setup per the switch installation instructions.
51.
Repeat steps 45 through 50 for Copper Switch-B in RU 11.
Fiber Switch A&B Installation.
52.
Reference the Cisco Installation Instructions provided with the switches.
53.
Install Fiber Switch-A switch in RU19 indicated in the equipment elevation (
). Use the mounting angles
provided with the switch. The horizontal bar on the rear rail will support the switch, eliminating excessive sag.
54.
Connect the switch to the desired FAPs and ports installed in the FRME1U (step 31a). For switches from RU 15
to RU21, Panduit recommends using part number FX2ERLNLNSNM001,
2-fiber OM3 1.6mm Jacket Patch Cord
LSZH LC Duplex to LC Duplex Std IL – 1M
. The cable should be routed through the Panduit CMPHF1 Horizontal
Cable Manger in RU 18. Refer to
Figure 21: Fiber Switch A and B mounted to front rail showing fiber cable rounting.
Figure 22: Fiber connections to FAPs inside of FRME1U. Yellow is for management ports. Aqua is for the Fiber Switches.
55.
Connect fiber patch cables to the management ports of the Fiber Switch (if applicable) and connect to ports
right side of the FRME1U enclosure as shown by the yellow cable in
. For switches from RU 15 to RU21,
Panduit recommends using part number FX2ERLNLNSNM001,
2-fiber OM3 1.6mm Jacket Patch Cord LSZH LC
Duplex to LC Duplex Std IL – 1M
.
56.
Connect a pre-installed ground cable to the rear of the switch. Refer to
. It is Tak-Ty on the right side
of the horizontal bar shown in