Panduit PZICEA Installation Instructions Manual Download Page 1

INSTALLATION INSTRUCTIONS CM361C

© Panduit Corp. 2008

FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp

Page 1 of 8

P

AN

Z

ONE

 

In-Ceiling Enclosure

PZICEA Active Equipment Version

Part Numbers:PZICEA

List of Components:

(1) Set of two Keys
(1) Left Mounting Bracket
(1) Right Mounting Bracket
(1) Fan Module
(6) Grommets
(2) Tak-Ty Rolls (Hook and Loop)
(4) Self-Tapping #10-32 screws
(1) Ceiling Tile Template
(1) Electrical Junction Box
(1) Integrated Horizontal Slack Manager
(1) Adjustable Air Dam
(2) Filters
(4) Entry/Exit Knockout Plates

Install in Ceiling

..........................................................................................................................................

Electrical Installation

.................................................................................................................................

Equipment Installation

...............................................................................................................................

Cable Routing and Slack

...........................................................................................................................

Patch Cord Management

...........................................................................................................................

Maintenance

...............................................................................................................................................

Accessories

................................................................................................................................................

2
3
4
5
6
8
8

Table of Contents

Fan Module

Air Inlet

Entry/Exit Knockout Plates (4x)

Electrical Junction Box

Mounting Brackets

Keyed Locks

Integrated 
Horizontal 

Slack Manager

Adjustable Air 

Dam

#10-32 screws

Set of two keys

Grommets

Ceiling tile template

Tak -Ty Rolls

Note: 

 Enclosure door load rating 

is 50 lbs.

Summary of Contents for PZICEA

Page 1: ...ling Tile Template 1 Electrical Junction Box 1 Integrated Horizontal Slack Manager 1 Adjustable Air Dam 2 Filters 4 Entry Exit Knockout Plates Install in Ceiling Electrical Installation Equipment Inst...

Page 2: ...out template over the removed ceiling tile Secure the template with tape of thumb tacks Trace the outline with a utility knife to extract the necessary shape to insert into the enclosure While the enc...

Page 3: ...experienced professional to the latest local building codes and regulations Conduit Knockouts Mounting Holes Receptacles not included Mount the electrical box to the side of the enclosure Use 4 10 32...

Page 4: ...ermination box 3 RU for Patch Panels facing forward 2 RU for Network Switches Brackets mounted toward front for deepest active equipment Recommended for switches 17 5 deep Brackets mounted toward back...

Page 5: ...n and close properly Entry Exit knockouts Page 5 of 8 Cable Routing Enclosure door open Enclosure door closed Utilizing the four back grommets requires a proper slack loop to allow the door to open an...

Page 6: ...ates how cables are routed from switch to patch panels Step 1 Plug in a 3 1m patch cord into a port on the switch Route patch cord up and into the integrated horizontal slack manager Create a loop in...

Page 7: ...into the integrated horizontal slack manager Create a loop in the patch cord and bring forward Plug other end of the patch cord into the desired jack in the patch panel Repeat the process for each bay...

Page 8: ...thread cutting screws as shown 2 Remove old filter and replace with new one 3 Install filter bracket with 3 6 32 thread cutting screws 4 Repeat process on opposite side 1 Unplug fan from power source...