
EN
- THE FIRST IGNITION AND PUTTING IN MARCH / SYNCHRONIZATION REMOTE CONTROL
ON/OFF, Press this symbol to turn on the motor, press again to turn o f f .
Press this symbol to lower the motor speed.
Press this symbol to increase motor speed,
Note:
If you have a motor version that exceeds 650m³/h, 3rd or 4th speed will be timed.
(*see Ecodesign Timer section, Page 17).
LAST TIME:
When the motor is on at any speed, pressing this button will start a 5-minute
timer, at the end of which time the motor and lights will switch off. When on, it is possible to
adjust the speed to the desired level. This function is indicated on the display by flashing
d o t s .This function offers a visual indicator by flashing the pilot lamp.
Red LED that will light up whenever a function is pressed.
MAIN OR WORKING LIGHT:
Press to switch on main lights and press again to switch off.
COURTESY OR AMBIENT LIGHT:
(Optionally, depending on model and version) Keeping
the key pressed for 2 seconds will switch on the courtesy light, and continuing pressing will
switch it off again.
SYNCHRONIZATION REMOTE CONTROL (* only if necessary, it is already synchronized):
1.
Connect the hood to the mains or turn on the hood switch, optional under filters or panel.
2.
ATTENTION!
: once step 2 is completed, when connecting the hood to the electricity:
DO NOT TOUCH ANY COMMAND KEY
UNTIL AFTER 5 SECONDS
3.
After the first 5 seconds
, in the interval time between 5 and 20 seconds, with the remote control facing the hood,
press or hold the LIGHT button
on the remote control, and the lights on the hood will light up, confirming
that the process has been successfully performed.
If it takes more than 20 seconds to synchronize the control, the hood switchboard closes the reception and
does not record any code, you must repeat the process, making sure to press the key between 5 "and 20".
37
Summary of Contents for E-232
Page 2: ...INOXPAN S L 2 ...
Page 26: ...SALIDAS OPCIONALES SAÍDAS OPCIONAIS SORTIES OPTIONNELLES OPTIONAL OUTPUTS 26 ...
Page 27: ...1 2 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 490 420 27 ...
Page 28: ...4 3 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION x4 28 ...
Page 29: ...5 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 6 push 29 Dx4 ...
Page 30: ...INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 8 7 30 ...
Page 31: ...INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 9 10 31 ...
Page 32: ...INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 11 12 32 ...
Page 33: ...OFF ON ANEXO ANNEX ANEXO ANNEXE 13 INSTALACIÓN INSTALAÇÃO INSTALLATION INSTALLATION 14 33 ...
Page 42: ...INOXPAN S L NOTAS NOTAS REMARQUES NOTES 42 ...
Page 43: ...INOXPAN S L 43 ...