Release 1.01
Office
, man-portable, self assembly type EC1.1
14)
Fit the ceiling panels.
(Fig. 21)
15)
These fit on the top of the retention bars
and slot together like the wall panels
Fig. 21
Fig. 24
16)
Slide on the roof panels. Take care to
ensure the lip locates correctly where the
two halves connect.
(Fig. 24 & 25).
17)
Fit the centre roof cap with 13mm bolts &
washers.
(Fig. 26 & 27).
Fig. 25
Fig. 26
Fig. 27
Fig. 22
18)
Fit the roof fascia to both long sides.
(Fig. 28).
19)
Fit the bolts into the four corners.
(Fig.29).
Congratulations
– you have completed your
office
!
Fig. 29
18) Weather seal the inner roof
(Optional - but recommended
)
Use the supplied silver waterproofing tape to seal between all
joints on the roof. This forms a second line of defence for extreme
weather conditions, we recommend it is applied as
follows:
a) Between roof panels
(Fig. 22)
b)
All around the edge of the roof panels where they meet the ceiling
retention bar.
Tip: Lap the tape over the ceiling panel and down over the
ceiling retention bar. This prevents capillary action in extreme weather
conditions.
c)
Pay particular attention to the corners of the roof frame.
(Fig. 23)
Fig. 23
Fig. 28