7 |
Put the bag on the cable with weight
8 |
Place the bag on the metal head. The are tunnels on the bag that should be passed through the metal head and hooked.
FLAT
More details:
Page 1: ...PLUS A 352 B 64 Technical parameters A B A A A A A 1 Mark four centres according to the cutout A A 2 Take a hole saw 68 mm and cut the holes A A 1 Choose one option that is possible for installation o...
Page 2: ...you can drill based on the cutout For FLAT PLUS sharp corners are needed 10 A B 2 Insert the panel into the hole 3 Insert the frame and tighten the screws Length of a screw for FLAT s installation to...
Page 3: ...to assemble pullout 3 Clip the plastic fastener on the cable to the metal head 4 Put the cable into the weight so that it fits to the pulley s groove in the weight 5 Follow direction of arrow no 1 to...
Page 4: ...7 Put the bag on the cable with weight 8 Place the bag on the metal head The are tunnels on the bag that should be passed through the metal head and hooked FLAT More details...