11.1.1.2
When replacing BBIC and X'tal
■
Preparation:
2. Supply AC 230V.
Note:
Test points: Refer to
[14.1.2 Main Board (Bottom View)]
.
No.
Items
Check Point
Procedure
1
1.8 V Supply Adjustment
CL437(BB1.8V)
1.
Confirm that the voltage between test point CL437 and CL109 (GND) is 1.8 V ±
0.02 V.
2.
Execute the command “VDD”, then check the current value.
3.
Adjust the 1.8V voltage of BB1.8V executing command “VDD XX” (XX is the
value).
2
3.3 V Supply Confirmation
CL438(BB3.3V)
1.
Confirm that the voltage between test point CL438 and CL109(GND) is 3.3 V ±
0.2 V.
3
RF3.2 V Supply Confirmation CL436(RF3.2V)
1.
Confirm that the voltage between test point CL436 and CL109(GND) is 3.2 V ±
0.2 V.
4
BBIC Clock Adjustment
CL402(BCLK)
1.
Confirm frequency between CL402 and CL109(GND).
2.
Input Command “sfr”, then you can confirm the current value.
3.
Check X’ tal Frequency. (10.368 MHz ± 100 Hz).
4.
If the frequency is not 10.368 MHz ± 100 Hz, adjust the frequency of CKM
executing the command “sfr xx xx” (where xx xx is the value: d) so that the
reading of the frequency counter is 10.368000 MHz ± 5 Hz.
- 54 -
Summary of Contents for VL-SV75 Series
Page 2: ......
Page 38: ... 38 ...
Page 39: ... 39 ...
Page 40: ... 40 ...
Page 41: ... 41 ...
Page 42: ... 42 ...
Page 50: ...10 2 4 1 Note for Microphone Assembly for anti feedback 50 ...
Page 52: ...10 3 Power Supply Unit 1 Remove 4 screws a 2 Remove the Power Board by unhooking 2 tabs 52 ...
Page 73: ...13 2 2 MIC Board MIC MIC C700 1000pF L700 L701 MIC1 1 2 VL V524 Mic Board 73 ...
Page 85: ...15 1 3 Power Supply Unit Q PCB401 P Q Q Q 407 403 404 406 405 402 401 85 ...
Page 102: ...SA ...