Use the self-check function to test the unit.
9 Self-check Function
1. Checking the IIC bus lines
2. Power LED Blinking timing
9.1. Check of the IIC bus lines
9.1.1. How to access
Self-check indication only:
Produce TV reception screen, and while pressing [VOLUME ( - )] button on the main unit, press [OK] button on the remote control
for more than 3 seconds.
Self-check indication and forced to factory shipment setting:
Produce TV reception screen, and while pressing [VOLUME ( - )] button on the main unit, press [MENU] button on the remote
control for more than 3 seconds.
9.1.2. Screen display
9.1.3. Check Point
Confirm the following parts if NG was displayed.
9.1.4. Exit
Disconnect the AC cord from wall outlet.
23
TH-50PV700AZ / TH-50PV700H / TH-50PV700M / TH-50PV700MR
Summary of Contents for Viera TH-50PV700AZ
Page 5: ...1 Applicable signals 5 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Page 21: ...8 2 Lead of Wiring 2 21 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Page 22: ...8 3 Lead of Wiring 3 22 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Page 26: ...9 4 No Picture 26 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Page 38: ...38 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Page 64: ...TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR 64 ...
Page 120: ...TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR 120 ...
Page 122: ...16 2 Packing Exploded Views 1 122 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Page 123: ...16 3 Packing Exploded Views 2 123 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Page 124: ...16 4 Packing Exploded Views 3 124 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Page 125: ...16 5 Replacement Parts List Notes 125 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...