
Fig. 10
Fig. 11
Notes:
1. Wedge A, B and C should be inserted following the sequence of 1, 2 and 3 shown in Fig. 11.
2. The wedges should be set 120° apart from each other.
3. Be certain that three wedges are firmly fixed and the Deflection Yoke is tightly clamped in place.
Otherwise the Deflection Yoke may shift its position and cause a loss of convergence and purity.
12
TX-21GX20R-IRAN
Summary of Contents for TX-21GX20R-IRAN
Page 13: ...3 Conductor Views 13 TX 21GX20R IRAN...
Page 14: ...4 Schematic Diagram 14 TX 21GX20R IRAN...
Page 15: ...15 TX 21GX20R IRAN...
Page 16: ...4 1 A Board 4 1 1 A Board 1 5 1A 2A 3A 5A 4A 6A 7A 8A 9A 16 TX 21GX20R IRAN...
Page 17: ...4 1 2 A Board 2 5 1B 2B 4B 3B 7B 6B 5B 8B 9B 1A 2A 3A 5A 4A 6A 7A 8A 9A 17 TX 21GX20R IRAN...
Page 18: ...4 1 3 A Board 3 5 1C 2C 4C 3C 7C 6C 5C 8C 9C 1B 2B 4B 3B 7B 6B 5B 8B 9B 18 TX 21GX20R IRAN...
Page 19: ...4 1 4 A Board 4 5 1D 2D 5D 3D 7D 6D 4D 8D 9D 1C 2C 4C 3C 7C 6C 5C 8C 9C 19 TX 21GX20R IRAN...
Page 20: ...4 1 5 A Board 5 5 1D 2D 5D 3D 7D 6D 4D 8D 9D 20 TX 21GX20R IRAN...
Page 21: ...4 2 L Board 4 2 1 L Board 1 3 1A 2A 3A 4A 5A 21 TX 21GX20R IRAN...
Page 22: ...4 2 2 L Board 2 3 1B 2B 3B 4B 5B 6B 1A 2A 3A 4A 5A 22 TX 21GX20R IRAN...
Page 23: ...4 2 3 L Board 3 3 1B 2B 3B 4B 5B 6B 23 TX 21GX20R IRAN...
Page 24: ...5 Parts Locations 24 TX 21GX20R IRAN...