2
TABLE OF CONTENTS
PAGE
PAGE
1 Safety Precautions
-----------------------------------------------
3
1.1. General Guidelines ----------------------------------------3
1.2. Touch-Current Check--------------------------------------3
2 Warning
--------------------------------------------------------------
4
2.1. Prevention of Electrostatic Discharge (ESD)
to Electrostatically Sensitive (ES) Devices ----------4
2.2. About lead free solder (PbF) ----------------------------5
3 Service Navigation
------------------------------------------------
6
3.1. Service Hint--------------------------------------------------6
3.2. Applicable signals ------------------------------------------7
4 Specifications
------------------------------------------------------
8
5 Service Mode
-----------------------------------------------------
10
5.1. How to enter into Service Mode ---------------------- 10
5.2. Service tool mode ---------------------------------------- 12
5.3. Hotel mode------------------------------------------------- 13
6 Troubleshooting Guide
----------------------------------------
14
6.1. Check of the IIC bus lines------------------------------ 14
6.2. Power LED Blinking timing chart --------------------- 15
6.3. No Power--------------------------------------------------- 16
6.4. No Picture -------------------------------------------------- 17
6.5. Local screen failure -------------------------------------- 18
7 Disassembly and Assembly Instructions
---------------
19
7.1. Remove the Rear cover -------------------------------- 19
7.2. Remove the Fan------------------------------------------ 19
7.3. Remove the P-Board ------------------------------------ 19
7.4. Remove the Side terminal cover and Rear
terminal cover --------------------------------------------- 19
7.5. Remove the Tuner unit --------------------------------- 20
7.6. Remove the A-Board ------------------------------------ 20
7.7. Remove the Speakers ---------------------------------- 21
7.8. Remove the Control button unit ---------------------- 21
7.9. Remove the GK-Board --------------------------------- 21
7.10. Remove the SU-Board---------------------------------- 21
7.11. Remove the SD-Board---------------------------------- 22
7.12. Remove the SC-Board---------------------------------- 22
7.13. Remove the SS2-Board -------------------------------- 22
7.14. Remove the SS-Board ---------------------------------- 23
7.15. Remove the Hanger metals and the Stand
brackets----------------------------------------------------- 23
7.16. Remove the C1-Board ---------------------------------- 23
7.17. Remove the C2-Board ---------------------------------- 23
7.18. Remove the Plasma panel section from the
Cabinet assy (glass)------------------------------------- 24
7.19. Remove the S-Board ------------------------------------ 24
7.20. Remove the Front glass -------------------------------- 25
7.21. Remove the K-Board ------------------------------------ 25
7.22. Remove the GL-Board ---------------------------------- 25
7.23. Replace the plasma panel ----------------------------- 25
8 Measurements and Adjustments
--------------------------
26
8.1. Adjustment Procedure ---------------------------------- 26
8.2. Adjustment ------------------------------------------------- 29
9 Block Diagram
---------------------------------------------------
33
9.1. Main Block Diagram ------------------------------------- 33
9.2. Block (1/4) Diagram ------------------------------------- 34
9.3. Block (2/4) Diagram ------------------------------------- 35
9.4. Block (3/4) Diagram ------------------------------------- 36
9.5. Block (4/4) Diagram ------------------------------------- 37
10 Wiring Connection Diagram
---------------------------------
39
10.1. Caution statement. -------------------------------------- 39
10.2. Wiring (1) -------------------------------------------------- 39
10.3. Wiring (2) -------------------------------------------------- 40
10.4. Wiring (3) -------------------------------------------------- 41
11 Schematic Diagram
--------------------------------------------
43
11.1. Schematic Diagram Note ------------------------------ 43
11.2. P-Board (1/2) Schematic Diagram ------------------ 44
11.3. P-Board (2/2) Schematic Diagram ------------------ 45
11.4. GK, GL, K and S-Board Schematic Diagram ----- 46
11.5. A-Board (1/20) Schematic Diagram----------------- 47
11.6. A-Board (2/20) Schematic Diagram----------------- 48
11.7. A-Board (3/20) Schematic Diagram----------------- 49
11.8. A-Board (4/20) Schematic Diagram----------------- 50
11.9. A-Board (5/20) Schematic Diagram----------------- 51
11.10. A-Board (6/20) Schematic Diagram----------------- 52
11.11. A-Board (7/20) Schematic Diagram----------------- 53
11.12. A-Board (8/20) Schematic Diagram----------------- 54
11.13. A-Board (9/20) Schematic Diagram----------------- 55
11.14. A-Board (10/20) Schematic Diagram --------------- 56
11.15. A-Board (11/20) Schematic Diagram --------------- 57
11.16. A-Board (12/20) Schematic Diagram --------------- 58
11.17. A-Board (13/20) Schematic Diagram --------------- 59
11.18. A-Board (14/20) Schematic Diagram --------------- 60
11.19. A-Board (15/20) Schematic Diagram --------------- 61
11.20. A-Board (16/20) Schematic Diagram --------------- 62
11.21. A-Board (17/20) Schematic Diagram --------------- 63
11.22. A-Board (18/20) Schematic Diagram --------------- 64
11.23. A-Board (19/20) Schematic Diagram --------------- 65
11.24. A-Board (20/20) Schematic Diagram --------------- 66
11.25. C1-Board (1/2) Schematic Diagram ---------------- 67
11.26. C1-Board (2/2) Schematic Diagram ---------------- 68
11.27. C2-Board (1/2) Schematic Diagram ---------------- 69
11.28. C2-Board (2/2) Schematic Diagram ---------------- 70
11.29. SC-Board (1/4) Schematic Diagram ---------------- 71
11.30. SC-Board (2/4) Schematic Diagram ---------------- 72
11.31. SC-Board (3/4) Schematic Diagram ---------------- 73
11.32. SC-Board (4/4) Schematic Diagram ---------------- 74
11.33. SS-Board (1/2) Schematic Diagram ---------------- 75
11.34. SS-Board (2/2) and SS2-Board Schematic
Diagram ---------------------------------------------------- 76
12 Printed Circuit Board
------------------------------------------
77
12.1. P-Board ---------------------------------------------------- 77
12.2. GK, K, S and SS2-Board ------------------------------ 80
12.3. GL-Board -------------------------------------------------- 81
12.4. A-Board ---------------------------------------------------- 82
12.5. C1-Board--------------------------------------------------- 84
12.6. C2-Board--------------------------------------------------- 85
12.7. SC-Board -------------------------------------------------- 86
12.8. SS-Board -------------------------------------------------- 89
13 Exploded View and Replacement Parts List
-----------
91
13.1. Exploded View and Mechanical Replacement
Parts List --------------------------------------------------- 91
13.2. Electrical Replacement Parts List ------------------- 98
Summary of Contents for TH-P42G10D
Page 17: ...17 6 4 No Picture ...
Page 28: ...28 8 1 4 Adjustment Volume Location 8 1 5 Test Point Location ...
Page 38: ...38 ...
Page 40: ...40 10 3 Wiring 2 ...
Page 41: ...41 10 4 Wiring 3 ...
Page 42: ...42 ...
Page 43: ...43 11 Schematic Diagram 11 1 Schematic Diagram Note ...
Page 79: ...79 A B C D E F G H I 1 2 3 4 5 6 P BOARD COMPONENT SIDE ETX2MM747MFF ...
Page 92: ...92 13 1 2 Packing 1 ...
Page 93: ...93 13 1 3 Packing 2 ...
Page 94: ...94 13 1 4 Mechanical Replacement Parts List ...
Page 98: ...98 13 2 Electrical Replacement Parts List 13 2 1 Replacement Parts List Notes ...