
7.17. Removal of the V1-Board and the V2-Board
1. Lay down the front frame on the flat surface of the table (covered by a soft cloth
not to damage the surface.)
2. Remove the couplers (V2 on the V1-Board and V15 on the V2-Board).
3. Unscrew the screws (×3
).
4. Remove the V1-Board, the V2-Board hold bracket and the V2-Board.
7.18. Removal of stand brackets
1. Remove the plasma panel section from the servicing stand and lay on a table
(covered), with the plasma panel surface facing downward.
Spread a soft cloth for protection, to prevent panel surface from scratching.
2. Remove the stand bracket (left, right) fastening screws (×4
each) and remove
the stand brackets (left, right).
36
Summary of Contents for TH-42PWD8WK
Page 8: ...5 ...
Page 18: ...7 4 Removal of the HX Board 1 Unscrew the screws 6 and remove the slot case 15 ...
Page 19: ...2 Unscrew the screws 4 3 Unscrew the screws 1 and remove the HX Board 16 ...
Page 24: ...2 Remove the couplers H37 3 Unscrew the screws 6 and remove the H3 Board right left 21 ...
Page 28: ...7 11 Removal of the SD Board 25 ...
Page 31: ...28 ...
Page 38: ...35 ...
Page 41: ...38 ...
Page 42: ...8 2 Wiring for 42 inch model 39 ...
Page 43: ...40 ...
Page 48: ...9 5 Test Point Location 45 ...
Page 49: ...10 Service mode 10 1 CAT computer Aided Test mode 46 ...
Page 52: ...49 ...
Page 55: ...11 Alignment 52 ...
Page 65: ...15 Block and Schematic Diagrams 15 1 Schematic Diagram Notes 62 ...
Page 66: ...63 ...
Page 67: ...64 ...
Page 68: ...65 ...
Page 122: ...119 ...
Page 125: ...122 ...
Page 191: ...15 Block and Schematic Diagrams 15 1 Schematic Diagram Notes 63 ...
Page 192: ...15 Block and Schematic Diagrams 15 1 Schematic Diagram Notes 63 ...