6.6. Remove the P-Board
Caution:
To remove P.C.B. wait 1 minute after power was off for
discharge from electrolysis capacitors.
1. Unlock the cable clampers to free the cable.
2. Disconnect the couplers (P2, P5, P9, P10, P11, P12, P23,
and P25).
3. Remove the screws (×5
, ×1
) and remove the P-
Board.
6.7. Remove the PA-Board
1. Unlock the cable clampers to free the cable.
2. Disconnect the couplers (PA1, PA2, PA5, PA10, PA31,
PA32, PA33, PA34 and PA40).
3. Disconnect the flexible cable (PA20).
4. Remove the screws (×4
) and remove the earth cable.
5. Remove the PA-Board.
6.8. Remove the tuner unit
1. Unlock the cable clampers to free the cable.
2. Disconnect the couplers (DG5, G51 and PA40).
3. Disconnect the flexible cables (DG3 and PA20).
4. Remove the screws (×4
) remove the tuner unit.
6.9. Remove the DG-Board
1. Disconnect the coupler (DG2).
2. Disconnect the flexible cables (DG1, DG15 and DG20).
3. Remove the screw (×7
) remove the DG-Board.
11
TH-42PV600AZ / TH-42PV600H / TH-42PV600M / TH-42PV600MT
Summary of Contents for TH-42PV600H
Page 5: ...1 Applicable signals 5 TH 42PV600AZ TH 42PV600H TH 42PV600M TH 42PV600MT ...
Page 27: ...8 3 No Picture 27 TH 42PV600AZ TH 42PV600H TH 42PV600M TH 42PV600MT ...
Page 30: ...30 TH 42PV600AZ TH 42PV600H TH 42PV600M TH 42PV600MT ...
Page 31: ...9 3 Option Description 31 TH 42PV600AZ TH 42PV600H TH 42PV600M TH 42PV600MT ...
Page 32: ...32 TH 42PV600AZ TH 42PV600H TH 42PV600M TH 42PV600MT ...
Page 66: ...TH 42PV600AZ TH 42PV600H TH 42PV600M TH 42PV600MT 66 ...
Page 120: ...TH 42PV600AZ TH 42PV600H TH 42PV600M TH 42PV600MT 120 ...
Page 122: ...15 2 Packing Exploded Views 1 122 TH 42PV600AZ TH 42PV600H TH 42PV600M TH 42PV600MT ...
Page 123: ...15 3 Packing Exploded Views 2 123 TH 42PV600AZ TH 42PV600H TH 42PV600M TH 42PV600MT ...
Page 124: ...15 4 Packing Exploded Views 3 124 TH 42PV600AZ TH 42PV600H TH 42PV600M TH 42PV600MT ...