2.1.1. Leakage Current Cold Check
1. Unplug the AC cord and connect a jumper between the two
prongs on the plug.
2. Measure the resistance value, with an ohmmeter, between
the jumpered AC plug and each exposed metallic cabinet
part on the equipment such as screwheads, connectors,
control shafts, etc. When the exposed metallic part has a
return path to the chassis, the reading should be between
1M
W
and 5.2M
W
.
When the exposed metal does not have a return path to
the chassis, the reading must be
.
Figure 1
2.1.2. Leakage Current Hot Check (See
Figure 1.)
1. Plug the AC cord directly into the AC outlet. Do not use an
isolation transformer for this check.
2. Connect a 1.5k
W
, 10 watts resistor, in parallel with a 0.15µF
capacitors, between each exposed metallic part on the set
and a good earth ground such as a water pipe, as shown in
Figure 1.
3. Use an AC voltmeter, with 1000 ohms/volt or more
sensitivity, to measure the potential across the resistor.
4. Check each exposed metallic part, and measure the
voltage at each point.
5. Reverse the AC plug in the AC outlet and repeat each of the
above measurements.
6. The potential at any point should not exceed 0.75 volts
RMS. A leakage current tester (Simpson Model 229 or
equivalent) may be used to make the hot checks, leakage
current
must
not
exceed
1/2
milliamp.
In
case
a
measurement is outside of the limits specified, there is a
possibility of a shock hazard, and the equipment should be
repaired and rechecked before it is returned to the
customer.
2 Safety Precautions
2.1. General Guidelines
1. When servicing, observe the original lead dress. If a short circuit is found, replace all parts which have been overheated or
damaged by the short circuit.
2. After servicing, see to it that all the protective devices such as insulation barriers, insulation papers shields are properly
installed.
3. After servicing, make the following leakage current checks to prevent the customer from being exposed to shock hazards.
6
TH-42PX600U
Summary of Contents for TH-42PV600
Page 5: ...1 Applicable signals 5 TH 42PX600U ...
Page 20: ...8 Location of Lead Wiring 8 1 Lead of Wiring 1 20 TH 42PX600U ...
Page 21: ...8 2 Lead of Wiring 2 1 21 TH 42PX600U ...
Page 22: ...8 3 Lead of Wiring 2 2 22 TH 42PX600U ...
Page 23: ...8 4 Lead of Wiring 3 1 23 TH 42PX600U ...
Page 24: ...8 5 Lead of Wiring 3 2 24 TH 42PX600U ...
Page 25: ...8 6 Lead of Wiring 4 1 25 TH 42PX600U ...
Page 26: ...8 7 Lead of Wiring 4 2 26 TH 42PX600U ...
Page 27: ...8 8 Lead of Wiring 5 27 TH 42PX600U ...
Page 32: ...9 4 No Picture 32 TH 42PX600U ...
Page 39: ...11 4 Adjustment Volume Location 11 5 Test Point Location 39 TH 42PX600U ...
Page 41: ...41 TH 42PX600U ...
Page 69: ...15 Schematic and Block Diagram 15 1 Schematic Diagram Notes TH 42PX600U 69 ...
Page 130: ...NOTE TH 42PX600U 130 ...
Page 131: ...16 Parts Location Mechanical Replacement Parts List 16 1 Parts Location 131 TH 42PX600U ...
Page 132: ...16 2 Packing Exploded Views 132 TH 42PX600U ...
Page 134: ...17 Electrical Replacement Parts List 17 1 Replacement Parts List Notes 134 TH 42PX600U ...