background image

- 4 -

2. PARTS IDENTIFICATION

Accessories

Steaming basket

  

Rice scoop

 

Measuring cup 

(Approx 180 ml) 

SR-TEG10 / SR-TEG18

Cook lamp

Warm lamp

Switch

Summary of Contents for SR-TEG18 - RICECOOKER 10 CUP

Page 1: ...r other hazards Do not modify the original design without permission of manufacturer IMPORTANT SAFETY NOTICE The service information is designed for experienced repair technicians only and is not designed for use by the general public It does not contain warnings or cautions to advise non technical individuals of potential dangers in attempting to service a product Products powered by electricity ...

Page 2: ...ng Procedure 5 1 Bubbling Test 5 2 Evaporation Test 5 3 Heat reserving Test 5 4 Boiling control lever adjustment 6 Disassembly 6 1 Hinge cover removal 6 2 Inner enclosure and Upper frame removal 7 Parts Exploded View and Replacement Parts List 7 1 Parts Exploded View Body 7 2 Parts Exploded View Packing 7 3 Replacement Parts List SR TEG10 SR TEG18 Detail Change Notice SR TEG10 SR TEG18 ...

Page 3: ...1 0 m 134 C 6 C 142 C Steaming basket Scoop Measuring cup 32W 33W Cooking White Rice 450W 630W Width Power Cord Center Thermostat Working Temperature Thermal Fuse Specification Weight Approx Accessories Specification subject to change without notice Length 1 5 cups 3 10 cups Depth 248 mm 276 mm Height 274 mm 274 mm 275 mm 275 mm 2 5 Kgs 3 1 Kgs SR TEG10 SR TEG18 ...

Page 4: ... 4 2 PARTS IDENTIFICATION Accessories Steaming basket Rice scoop Measuring cup Approx 180 ml SR TEG10 SR TEG18 Cook lamp Warm lamp Switch ...

Page 5: ...Lamp Keep Warm Lamp Side Heater Cast Heater Thermal Fuse SR TEG10 SR TEG18 Thermal Fuse Lead Wire B Black Lamp Lead Wire B White 18 Yellow 10 Body Earth Lead Wire Green To inlet Side Heater Lead Wire A Red Lamp Lead Wire C Red Thermal Fuse Lead Wire A Black Lamp Lead Wire A Black Lamp Lead Wire C Red Lamp Lead Wire B White Side Heater Lead Wire B Orange Rice Cooking Lever ...

Page 6: ...ing process is turned on Is the micro switch across C to NC conductive when the rice boiling process is turned off Yes Is the rice boiling control lever properly adjusted The operation is wrong Forcibly flow the electric current Check with the evaporation test No No Adjust the control lever No Yes Is the rice boiling control lever properly adjusted No Yes Yes Replace the center thermostat Does the...

Page 7: ...nductive Improper operation Yes No No Explain the proper operation Mixed rice is boiled Rice is not washed sufficiently Bran remains still The pan bottom is conditioned to generate burning easily Germ rice or wheat mixed rice is boiled The voltage is lower than specified Water is excessive Improper operation Yes No Check with the bubbling test Does the center thermostat operate properly Yes Yes Ye...

Page 8: ...ously hole the paper 3 Water on the pan bottom is completely evaporated to be empty This timing is an follows Within 1 minute before the boiling switch is turned off Within 1 minute after the boiling switch is turned off Place a weight so that its gravity center may be aligned at the center 2 When it beings boiling to produce steam Remove the lid immediately check the bubbling condition on the pan...

Page 9: ... it becomes approx 70 C close the lid After the warming heater is activated for 1 hour or more check the heat reserving temperature Top view of pan Holes on the tissue paper Pan flange Tissue paper Mercury thermometer Urethane foam blocks Mercury thermometer Inner Pan 5 4 Boiling control lever adjustment Such a mechanical operation as center thermostat goes up and down is used to turn on and off t...

Page 10: ... Inner enclosure and Upper frame removal 1 As show in the figure pry up three fastening hooks Fixing the upper frame turn the inner enclosure in the arrow direction 2 The upper frame will be seperated from the inner enclosure and the upper frame SR TEG10 SR TEG18 Note When assembling refer to the illustration without the position relationship between the Inner Enclosure and the Upper Frame 6 DISAS...

Page 11: ... 7 PARTS EXPLODED VIEW AND REPLACEMENT PARTS LIST 7 1 Parts Exploded View Body SR TEG10 SR TEG18 14 15 16 1 11 12 2 3 4 5 7 6 8 9 10 13 17 B D H E F 18 19 26 I 30 31 28 27 34 32 33 29 G 20 21 22 23 24 25 H ...

Page 12: ...xxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxx xxxxxxxxxx xxxxxxxxxx xxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxx xxxxxxxxxx xxxxxxxxxx xxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxx xxxxxxxxxx 1 3 4 5 6 2 7 8 ...

Page 13: ... WU ARE50M921 ARE50T920 7 LID CAUTION LABEL 8 OUTER LID COMP 9 FLUORO PAN 10 THERMOSTAT ASSY AQS00T270B0U 11 OUTER SPRING ARS61H616 ARL20M921 0U 12 CAST HEATER ASSY ARL20M920 0U ARE00L6171W9 ARE00L6161W9 ARE20T9201 ARB74H616 ARE20T9211 13 UPPER FRAME 14 HINGE SHAFT 15 PROTECTING FRAME 16 THERMAL FUSE ASSY ARN40T92030U ARL10R68910U ARL10R68710U ARE10H921 SP ARE10H920 HO 17 SIDE HEATER ASSY 18 BODY ...

Page 14: ...1M9201CN ARZ80V921 SP ARZ80V920 LT ARZ80V920 SP ASR758T344B 1 UPPER PAD ASSY 2 PLASTIC SHEET 3 CORD PROTECTOR 5 RUST PROOF PAPER 4 LOWER PAD ASSY 6 INNER PACKING CASE 7 POS LABEL 8 Screws REF NO PART NAME PART NO SAFETY REMARK MODEL Q TY TEG10 TEG18 2 2 2 2 1 1 1 1 1 1 1 2 1 2 2 2 1 1 TAPPING SCREW XTB4 10GFJ FOR HANDLE SOFT PINK HARMONY ORCHID SOFT PINK PLATINUM SILVER PLATINUM SILVER CHAMPAGNE G...

Page 15: ...E GOLD CN 2 2 3 ADD PAGE NO 2 3 ADD CONTENT AND SPECIFICATION 4 11 12 REVISE PICTURES FOR SAME FACTORY ORDER SUPPLIERS 5 13 14 REVISE SOME PARTS NO FOR USE PART NO CORRECT 3 2 14 REVISE TO NEW PATTERN USE PATTERN SAME OTHER PRODUCTS REVISION ITEM NO PAGE DETAIL REMARK SR TEG10 SR TEG18 ...

Reviews: