Page 1-12
Installing Procedure
5) Removing the fixing metal fittings
After leveling, remove the fixing metal fittings on the board lifter, recognition unit and squeegee
head.
∗
Be careful of interference between the connecting rod and the lift unit.
6) Connecting the power source and air source
Connect the primary power source and primary air source.
7) Adjusting the air pressure
Adjust the regulator so that the secondary air pressure is 0.5 MPa.
8) Power supply
(1) Turn ON the main power switch.
(2) Turn ON the servo switch.
(3) Check that the limit switch of the front safety cover works.
Then start the operation, following the procedure on the operating manual.
2. Servo switch
1. Main power switch
M 92E
POWER AND AIR SOURCES SHOULD BE CONNECTED AT THE LAST OF
INSTALLING OPERATION.
If they are connected earlier, you may get an electric shock or injured.
WARNING
OFF ( ) ON ( )
SERVO
STOP
UNLOCK
STEP
START
SELECT
KEY LOCK
REL
EA
SE
TR
IP
O
F
F
ON
RE
S
E
T
1F4C-AA00
1F4C-E-IMA01-A01-01