Caution:
The static electricity of your clothes will not be grounded through
the wrist strap.
So take care not to let your clothes touch the traverse deck (optical
pick-up).
5. Operation Checks and Component Replacement /
Procedures
- This section describes procedures for checking the operation of
the major printed circuit boards and replacing the main
components.
- For reassembly after operation checks or replacement, reverse the
respective procedures. Special reassembly procedures are
described only when required.
5.1. Checking for the main P.C.B.
5.1.1. Checking for the main P.C.B. (A side)
5
Summary of Contents for SL-CT700GD
Page 7: ... Check the main P C B B side as shown below 7 ...
Page 8: ...5 2 Replacement for the CD lid unit shaft and axle hole board 8 ...
Page 10: ...10 ...
Page 34: ...18 Cabinet Parts Location 19 Traverse Unit Parts Location 34 ...
Page 35: ...20 Packaging 35 ...
Page 36: ...21 Schematic Diagram for printing with letter size F0212YM KH 36 ...
Page 45: ......