36
9 Measurements and Adjustments
9.1.
EEPROM Data for spare parts of the MAIN P.C.B.
After replacing the MAIN P.C.B., be sure to achieve adjustment.
As for Adjustment condition/procedure, consult the “Adjustment Manual” which is available in Adjustment software.
The adjustment instruction is available at “Software download” on the “Support Information from NWBG/VDBG-AVC” web-site in
“TSN System”.
9.2.
Service Positions
9.2.1.
List of the extension cables
Use the following extension cables when checking or adjusting individual circuit boards except module Parts (Main P.C.B.).
Summary of Contents for SDR-H85P
Page 12: ...12 3 3 2 Precautions for installing HDD...
Page 16: ...16 4 Specifications...
Page 18: ...18...
Page 19: ...19...
Page 23: ...23 7 Service Fixture Tools 7 1 Service Tools and Equipment...
Page 26: ...26 Fig D2 Fig D3 Fig D4...
Page 28: ...28 Fig D7 Fig D8 Fig D9...
Page 30: ...30 Fig D14 Fig D15 Fig D16 Fig D17...
Page 31: ...31 Fig D18 Fig D19 Fig D20 Fig D21...
Page 32: ...32 Fig D22 Fig D23 Fig D24...
Page 33: ...33 Fig D25...
Page 35: ...35 8 4 1 How to use of CCD positioning pin RFKZ0476...
Page 38: ...38 9 3 Location for Connectors of the Main P C B 9 3 1 Main P C B...
Page 55: ...S 13...
Page 57: ...S 15 FT901 1 2 S601 2 4 SDR H85 H86 H95 MONI FPC P C B...
Page 62: ...S 20...
Page 70: ...S7 2 LCD Section S 28 15 17 16 18 34 19 20 21 33 B17 B26 B27...