56
Step 12 :
Place the Bottom Ornament Unit & NFC P.C.B. on the
Insulating Material.
Step 13 :
Connect 14P FFC at connector (CN6007) on Main
P.C.B..
Step 14 :
Connect 2P wire at connector (CN7001) on NFC
P.C.B..
Step 15 :
Place the SMPS Unit as shown.
Step 16 :
Connect 7P extension cable (REX1538) from
CN1100 on the Main P.C.B. to P1700 on the SMPS P.C.B..
Step 17 :
Place the CD Mechanism as shown.
Step 18 :
Connect 24P extension cable (REE1978) from P5003
on the Main P.C.B. to CN7002 on the CD Interface P.C.B..
Step 19 :
Remove 1 screw.
Step 20 :
Release 5P wire from the slots.
Summary of Contents for SC-HC49EG
Page 11: ...11 5 Location of Controls and Components 5 1 Main Unit Remote Control Key Button Operations ...
Page 16: ...16 7 Troubleshooting Guide This section is not available at the time of issue ...
Page 19: ...19 8 3 Types of Screws 8 4 Main Parts Location Diagram ...
Page 50: ...50 Step 3 Lift up to remove Jack Lid in the direction as shown ...
Page 58: ...58 ...
Page 66: ...66 ...
Page 84: ...84 ...
Page 92: ...92 ...