10.1.3. Disassembly of Loading Section
Step 1
Spread the tabs at the both sides and push out the drive
arm.
Step 2
Hook the lock lever spring on the lock lever projection
part temporarly.
Step 3
Unlock the tab and remove the lock lever.
Step 4
Remove the belt.
Step 5
Unlock the tab and remove the pulley gear.
Step 6
Remove the relay gear.
Step 7
Turn the change lever in the arrow direction till it stops.
Step 8
Hook the change lever spring on the change lever
project part temporarily.
49
SA-PT250GCP
Summary of Contents for SA-PT250GCP
Page 5: ...25 Replacement Parts List 108 25 1 Component Parts List 109 5 SA PT250GCP ...
Page 12: ...12 SA PT250GCP ...
Page 36: ...9 2 Main Components and P C B Locations 36 SA PT250GCP ...
Page 51: ...Step 3 Remove the middle chassis Step 4 Remove the traverse unit 51 SA PT250GCP ...
Page 66: ...SA PT250GCP 66 ...
Page 74: ...SA PT250GCP 74 ...
Page 76: ...76 SA PT250GCP ...
Page 104: ...24 Exploded Views 104 SA PT250GCP ...
Page 105: ...24 1 Cabinet Parts Location SA PT250GCP 105 ...
Page 106: ...SA PT250GCP 106 ...
Page 107: ...24 2 Packaging SA PT250GCP 107 ...