10.1.3. Disassembly of Loading Section
Step 1 Spread the tabs at the both sides and push out the drive
arm.
Step 2 Hook the lock lever spring on the lock lever projection
part temporarly.
Step 3 Unlock the tab and remove the lock lever.
Step 4 Remove the belt.
Step 5 Unlock the tab and remove the pulley gear.
Step 6 Remove the relay gear.
Step 7 Turn the change lever in the arrow direction till it stops.
Step 8 Hook the change lever spring on the change lever
project part temporarily.
48
SA-PT160GC / SA-PT160GCP / SA-PT160GCS / SA-PT160GCT / SA-PT160GS
Summary of Contents for SA-PT160GC
Page 12: ...12 SA PT160GC SA PT160GCP SA PT160GCS SA PT160GCT SA PT160GS ...
Page 19: ...7 5 4 Connection for Set Top Box 19 SA PT160GC SA PT160GCP SA PT160GCS SA PT160GCT SA PT160GS ...
Page 64: ...64 SA PT160GC SA PT160GCP SA PT160GCS SA PT160GCT SA PT160GS ...
Page 66: ...SA PT160GC SA PT160GCP SA PT160GCS SA PT160GCT SA PT160GS 66 ...
Page 74: ...74 SA PT160GC SA PT160GCP SA PT160GCS SA PT160GCT SA PT160GS ...
Page 94: ...SA PT160GC SA PT160GCP SA PT160GCS SA PT160GCT SA PT160GS 94 ...
Page 95: ...24 2 Packaging SA PT160GC SA PT160GCP SA PT160GCS SA PT160GCT SA PT160GS 95 ...
Page 96: ...SA PT160GC SA PT160GCP SA PT160GCS SA PT160GCT SA PT160GS 96 ...