30
Chapter 1
Transmission Delay Time
Operation at power-on
1. Time required for power-on
(Depends on the supplied power)
Power-on
Completion of
transmission check
READY
output
3. Output
0.5ms
ON
OFF
ON
OFF
ON
OFF
S-LINK V
controller
2. Transmission
check
● READY output at normal starting
● READY output at starting after shorting line
between
+
24V and 0V or between D and G line
● Error output 1 and 2
<Table 3 Time required for transmission check at starting controller>
Number of
I/O control
points
Time required for transmission check
at starting cotroller
(ms)
A mode
B mode
C mode
32
69.5
134.3
422.1
64
82.6
186.8
632.2
96
100.4
258.1
917.5
128
123.0
348.3
1278.1
160
150.2
457.2
1713.9
192
182.2
585.0
2225.0
224
218.8
731.6
2811.4
256
260.2
897.0
3473.0
288
306.2
1081.2
4209.9
320
357.0
1284.3
5022.1
352
412.4
1506.1
5909.5
384
472.6
1746.8
6872.2
416
537.5
2006.3
7910.1
448
607.1
2284.6
9023.4
480
681.3
2581.7
10211.8
512
760.3
2897.6
11475.6
●
READY output delay time (1 + 2 + 3)
1 (Depending on supplied power) + 2 (From Table 3) + 3 (0.5 ms)
Error signal outputting delay time
<Table 4 Time required for error check (errors 3, 4, and 5)>
Number of
I/O control
points
Time required for error check (errors 3, 4, and 5) (ms)
A mode
B mode
C mode
32
43.5
174.0
695.8
64
93.4
373.6
1494.3
96
162.1
648.4
2593.8
128
249.6
998.6
3994.4
160
356.0
1424.0
5696.0
192
481.2
1924.7
7698.7
224
625.2
2500.6
10002.4
256
788.0
3151.8
12607.2
288
969.6
3878.3
15513.1
320
1170.0
4680.0
18720.0
352
1389.2
5557.0
22228.0
384
1627.3
6509.2
26037.0
416
1884.2
7536.8
30147.1
448
2159.9
8639.6
34558.2
480
2454.4
9817.6
39270.4
512
2767.7
11070.9
44283.6
<Table 5 Time required for error check (errors 1 and 2)>
Time required for error check (errors 1 and 2) (ms)
A mode
B mode
C mode
1.33
5.32
21.28
Occurrence of error
Error output
2. Output
0.5ms
ON
OFF
S-LINK V
controller
1. Error check
● Error output 1 and 2
●
Error output delay time (1 + 2)
1 (From Table 4 or 5) + 2 (0.5ms)
Summary of Contents for S-LINK V
Page 2: ...2 ...
Page 5: ...5 Before Using This System ...
Page 12: ...12 Before Using This System MEMO ...
Page 13: ...13 Chapter 1 Designing System ...
Page 35: ...35 Chapter 2 Wiring ...
Page 60: ...60 Chapter 2 MEMO ...
Page 61: ...61 Chapter 3 Starting System ...
Page 71: ...71 Chapter 4 Specifications ...
Page 161: ...161 Chapter 5 Troubleshooting ...
Page 169: ...169 Appendix ...
Page 180: ...180 Appendix MEMO ...