B. Install the Mechanism Chassis and Cassette Up Ass’y straight
onto the TV/VCR Main C.B.A. so that the Sensor LED clears the
hole in the Mechanism Chassis and that 3 Connectors (P6201,
P3001 and P4001) are aligned and seated securely.
5. Installation of Cassette Up Ass’y
A. Confirm that the Locking Tab under the Cassette Up Ass'y is in
Hole on the Mechanism Chassis when installing the Cassette Up
Ass'y. Then, slide the Cassette Up Ass'y towards the back.
B. When installing 2 Screws (449), slide the Holder Unit (Refer to "
WHEN LOADING WITHOUT A CASSETTE
" in Service Notes) to
tighten screws. Then, slide it back to the EJECT Position.
C. Hook Spring to the Drive Rack Arm on the Mechanism Chassis.
6.2. MECHANISM SECTION
6.2.1. Disassembly/Reassembly Method
27
Summary of Contents for PV-C1323A
Page 26: ...6 1 2 Disassembly Method Fig D2 22 ...
Page 27: ...Fig D3 23 ...
Page 28: ...6 1 2 1 Notes in chart 1 Removal of VCR Unit Fig D4 24 ...
Page 32: ...6 2 2 Inner Parts Location Fig J1 1 28 ...
Page 33: ...6 2 3 EJECT Position Confirmation Fig J1 2 29 ...
Page 34: ...6 2 4 Full Erase Head and Cylinder Unit Fig J2 30 ...
Page 74: ...70 ...
Page 77: ...11 2 MECHANISM BOTTOM SECTION 73 ...
Page 78: ...11 3 CASSETTE UP COMPARTMENT SECTION 74 ...
Page 79: ...11 4 CHASSIS FRAME SECTION 1 75 ...
Page 80: ...11 5 CHASSIS FRAME SECTION 2 76 ...
Page 81: ...11 6 PACKING PARTS AND ACCESSORIES SECTION 77 ...
Page 88: ...123 LSSQ0278 INFRARED REMOTE CONTROL UNIT F 6 84 ...
Page 98: ...R559 ERDS2TJ123 CARBON 1 4W 12K F G 94 ...
Page 101: ...R4523 ERJ6GEY0R00V MGF CHIP 1 10W 0 97 ...
Page 103: ...R6015 ERJ6GEYJ101V MGF CHIP 1 10W 100 99 ...
Page 109: ...C3056 ECJ2VF1E104Z C CHIP 25V 0 1UF 105 ...
Page 125: ...R5504 ERJ6GEYJ101V MGF CHIP 1 10W 100 121 ...
Page 127: ...R6054 ERJ6GEYJ102V MGF CHIP 1 10W 1K 123 ...