Chapter 2
Getting Started — Installing/removing the projector
ENGLISH - 37
13)
Attach the safety wire.
i) Pull one end of the safety wire around the shaft holder and put through the loop as shown in the figure below.
ii)
Secure the bracket of the safety wire with commercially available tapping screw (head diameter: Φ3.8 mm
(5/32")) to the sturdy ceiling with reinforcing material as shown in the figure below.
(i)
(ii)
Ceiling
Within 600 mm
Ceiling foundation
(Field edge or
reinforcing material)
Ceiling material
(Gypsum board, etc.)
Track system
Shaft holder
Safety wire
Pole
Cables from main unit
to power supply unit
Tapping screw
Bracket
Bracket
Tapping screw
Ceiling hole
14)
Align the orientation of the adapter to the track system.
f
Hold up the adapter and align the orientation as follows.
g
When using the track system of Nordic Aluminium, align the side with the protrusion (adapter) to the side
without the protrusion (track system).
g
When using the track system of EUTRAC Stromschienen or ERCO, align the side with the protrusion
(adapter) to the side with the groove (track system).
For Nordic Aluminium
For EUTRAC Stromschienen
For ERCO
Track system
Track system
Track system
Adapter
Adapter
Protrusion
Protrusion
Groove
Groove
15)
Mount the adapter to the track system.
f
Insert the adapter into the opening of the track system.
f
The adapter of the projector cannot be mounted to the position of the tapping screw fixing the track system
to the ceiling or beam.