- 10 -
Service Manual
D
ISASSEMBLY
FOR
S
ERVICE
PTV F
RAME
A
SSEMBLY
(O
NLY
65”)
Caution: The screen frame is painted. Handle parts with care.
Follow the procedure below for the assembly of the plastic PTV screen frame. See Fig . for reference.
1.
Insert the metal support into the side and top
pieces as shown.
2.
Assemble the frame as illustrated below using
listed hardware. Use 8 to 10 Kgfcm torque to
fasten the screws.
PTV Screen Assembly
screws (33)
Frame
Metal Support
Frame
Frame
Metal Bracket
Corner
(4)
(3)
Side
(2)
Top (1)
Frame
Bottom (1)
(2)
Metal Support-Top
(1)
Summary of Contents for PT- 56WX51CE
Page 25: ... 25 Service Manual G Board K Board Schematics G Board Schematic K Board Schematic ...
Page 26: ... 26 Service Manual G Board K Board PCB G Board PCB K Board PCB ...
Page 27: ... 27 Notes ...
Page 28: ... 28 Printed in USA K01062205PL0627 ...
Page 56: ... 28 A BOARD SCHEMATIC DIAGRAMA ELÉCTRICO TARJETA A A BOARD TARJETA A ...
Page 57: ... 29 A BOARD SCHEMATIC DIAGRAMA ELÉCTRICO TARJETA A A BOARD TARJETA A ...
Page 58: ... 30 A BOARD SCHEMATIC DIAGRAMA ELÉCTRICO TARJETA A A BOARD TARJETA A ...
Page 59: ... 31 A BOARD SCHEMATIC DIAGRAMA ELÉCTRICO TARJETA A A BOARD TARJETA A ...
Page 61: ... 33 Notes ...
Page 62: ... 34 Printed in USA K01052203ZR0511 ...
Page 111: ... 49 ALL MODELS D Board Layout ...
Page 112: ... 50 ALL MODELS D Board Schematic Left Portion ...
Page 113: ... 51 ALL MODELS D Board Schematic Right Portion ...
Page 114: ... 52 ALL MODELS A Board Schematic Left Portion ...
Page 115: ... 53 ALL MODELS A Board Schematic Left Middle Portion ...
Page 116: ... 54 ALL MODELS A Board Schematic Right Middle Portion ...
Page 117: ... 55 ALL MODELS A Board Schematic Right Portion ...
Page 118: ... 56 ALL MODELS DH Board Schematic ...
Page 125: ... 63 Notes ...