EN - 25
ENGLISH
Electrical Wiring Work
Wiring Guide Opening
Wiring guide opening is located at the front, back and right side surfaces. (Power supply holes of Ø 26 and Ø 38 are
furnished in three directions)
When the panel attachment after work is incomplete, penetration of rainwater is possible. Securely
fasten the panels after work.
Caution
Use a cable bundling tie to eliminate wire
slack without touching the sheet metal.
Power line and communication line connect to Refrigeration Unit
through conduit .
STP cable (Shielded Twisted Pair)
Cable bundling tie
Always thread wires through
the rectangle hole furnished at
the bottom of the electrical box.
01̲OCU-CR200VF5.indd 25
01̲OCU-CR200VF5.indd 25
2018/12/28 15:17:10
2018/12/28 15:17:10