1 SCHEMATIC DIAGRAM
5
1.1.
APH
5
1.2.
CPH
6
2 MEASUREMENTS AND ADJUSTMENTS
7
2.1.
Adjustment of primary latch switch, secondary latch switch
and short switch.
7
2.2.
Measurement of microwave output
7
3 PROCEDURE FOR MEASURING MICROWAVE ENERGY
LEAKAGE
8
3.1.
Equipment
8
3.2.
Procedure for measuring radiation leakage
8
3.3.
Record keeping and notification after measurement
8
3.4.
At least once a year, have the radiation monitor checked
for calibration by its manufacturer.
8
4 EXPLODED VIEW AND PARTS LIST
9
4.1.
EXPLODED VIEW
9
4.2.
PARTS LIST
10
4.3.
ESCUTCHEON BASE ASSEMBLY
12
4.4.
WIRING MATERIALS
14
4.5.
PACKING AND ACCESSORIES
15
4.6.
DOOR ASSEMBLY
16
5 DIGITAL PROGRAMMER CIRCUIT
17
5.1.
NN-P994 APH/CPH
17
5.2.
NN-T994SF APH, T984SF APH
19
5.3.
NN-T964SF APH
21
5.4.
H964BF/WF APH, H964BF/WF CPH, S954BF/WF APH
23
5.5.
H944BF(W)/WF(W) APH, H934BF/WF APH,
H924BF(W)/WF(W) APH, S944BF(W)/WF(W) APH,
S924BF(W)/WF(W) APH, S914BF/WF APH
25
5.6.
PARTS LIST
27
CONTENTS
Page
Page
4
NN-P994 NN-T994SF
Summary of Contents for NNP994 - MICROWAVE -2.2 CU.FT
Page 2: ...2 NN P994 NN T994SF ...
Page 3: ...3 NN P994 NN T994SF ...
Page 5: ...1 SCHEMATIC DIAGRAM 1 1 APH 5 NN P994 NN T994SF ...
Page 6: ...1 2 CPH 6 NN P994 NN T994SF ...
Page 9: ...4 EXPLODED VIEW AND PARTS LIST 4 1 EXPLODED VIEW 9 NN P994 NN T994SF ...
Page 17: ...5 DIGITAL PROGRAMMER CIRCUIT 5 1 NN P994 APH CPH 17 NN P994 NN T994SF ...
Page 18: ...18 NN P994 NN T994SF ...
Page 19: ...5 2 NN T994SF APH T984SF APH 19 NN P994 NN T994SF ...
Page 20: ...20 NN P994 NN T994SF ...
Page 21: ...5 3 NN T964SF APH 21 NN P994 NN T994SF ...
Page 22: ...22 NN P994 NN T994SF ...
Page 23: ...5 4 H964BF WF APH H964BF WF CPH S954BF WF APH 23 NN P994 NN T994SF ...
Page 24: ...24 NN P994 NN T994SF ...
Page 26: ...26 NN P994 NN T994SF ...
Page 36: ...SCHEMATIC DIAGRAM APH 7 SCHEMATIC DIAGRAM APH ...
Page 37: ... 8 SCHEMATIC DIAGRAM CPH SCHEMATIC DIAGRAM CPH ...
Page 62: ... 33 ...
Page 63: ... 34 ...