1 SCHEMATIC DIAGRAM
5
1.1.
APH
5
1.2.
CPH
6
2 MEASUREMENTS AND ADJUSTMENTS
7
2.1.
Adjustment of primary latch switch, secondary latch switch
and short switch.
7
2.2.
Measurement of microwave output
7
3 PROCEDURE FOR MEASURING MICROWAVE ENERGY
LEAKAGE
8
3.1.
Equipment
8
3.2.
Procedure for measuring radiation leakage
8
3.3.
Record keeping and notification after measurement
8
3.4.
At least once a year, have the radiation monitor checked
for calibration by its manufacturer.
8
4 EXPLODED VIEW AND PARTS LIST
9
4.1.
EXPLODED VIEW
9
4.2.
PARTS LIST
10
4.3.
ESCUTCHEON BASE ASSEMBLY
12
4.4.
WIRING MATERIALS
14
4.5.
PACKING AND ACCESSORIES
15
4.6.
DOOR ASSEMBLY
16
5 DIGITAL PROGRAMMER CIRCUIT
17
5.1.
NN-P794 APH/CPH
17
5.2.
NN-T794SF APH, NN-T784SF APH, NN-T774SF APH 19
5.3.
NN-T764SF APH, NN-T754SF APH
21
5.4.
NN-H764 APH/CPH, S754BF/WF APH
23
5.5.
NN-H744BF/WF APH, H724BF/WF APH, S744BF/WF
APH
25
5.6.
PARTS LIST
27
CONTENTS
Page
Page
4
NN-P794 NN-T794SF / NN-T784SF NN-T774SF / NN-T764SF NN-T754SF / NN-H764 NN-S754 / NN-H744 NN-S744 / NN-H724
Summary of Contents for NN-T794SF
Page 36: ...SCHEMATIC DIAGRAM APH 7 SCHEMATIC DIAGRAM APH ...
Page 37: ... 8 SCHEMATIC DIAGRAM CPH SCHEMATIC DIAGRAM CPH ...
Page 62: ... 33 ...
Page 63: ... 34 ...