5-8
CAUTIONS
1. DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE
OUTER CASE FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH
VOLTAGE CAPACITOR AND REMOVING THE WIRE LEADS FROM THE PRIMARY WINDING OF THE
HIGH VOLTAGE TRANSFORMER. (SEE PAGE 2-1)
2. ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER
OF WATER IN CONTAINER) IN THE OVEN.
COMPONENTS
TEST PROCEDURE
RESULTS
HIGH VOLTAGE
TRANSFORMER
(Wire leads removed)
MAGNETRON
(Wire leads removed)
1. Measure the resistance.
(Ohm-meter scale: Rx1)
• Primary winding
• Secondary winding
• Filament winding
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Primary winding to ground
• Filament winding to ground
1. Measure the resistance.
(Ohm-meter scale: Rx1)
• Filament terminal
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Filament to chassis
Approx.: 1.4 ohm
Approx.: 90 ohm
Less than: 1 ohm
Normal: Infinite
Normal: Infinite
Normal: Less than 1 ohm
Normal: Infinite
COMPONENT TEST PROCEDURE
PRIMARY
TERMINAL
SECONDARY
WINDING
FILAMENT
WINDING
TERMINAL
Summary of Contents for NN-ST34HMYTE
Page 10: ...SCHEMATIC DIAGRAM 4 4...
Page 30: ...6 2 DOOR PARTS D03...
Page 31: ...6 3 CONTROL PANEL PARTS C 05...
Page 32: ...6 4 OVEN CAVITY PARTS...
Page 33: ...6 5 LATCH BOARD PARTS...
Page 34: ...INTERIOR PARTS 6 6...
Page 35: ...6 7 BASE PLATE PARTS...
Page 41: ......