DANGER HIGH VOLTAGE
Test if failure codes of H97 or H98 appears by doing the following procedure. It is recommended to
use an AC line input current Ampere meter for testing.
Test1
1. Program DPC.
A. Tap Clock
B. Tap Timer
C. Tap Start
D. Tap Power Level
2. Place 1 liter of water load into oven cavity.
3. Unplug 2 pin H.V. lead wire connector CN703 from magnetron tube.
4. Program oven at High power for 1 minute and press start.
A. After approximately 23 seconds, oven stops.
B. During oven operation, input current is approximately 0.5 to 1A. If
both a and b are OK, please proceed to test 2.
INPUT AMPERE FAILURE CODE
Unplug CN703
0.5 to 1A
Oven stops in
23 seconds
after started.
Test2
Continued from Test 1
1. Unplug 3 pin connector CN701, CN703 remains unplug.
2. Set oven at High power for 1 minute and start.
A. After approximately 3 seconds, oven stops.
29
Summary of Contents for NN-P295
Page 3: ...3 ...
Page 4: ...4 ...
Page 5: ...5 ...
Page 6: ...1 SCHEMATIC DIAGRAM 1 1 APH NN P295 H275 1 2 APH NN S255 6 ...
Page 7: ...1 3 APH NN H264 FR S254 FR 7 ...
Page 8: ...1 4 CPH NN P295 H275 8 ...
Page 9: ...1 5 CPH NN S255 S245 9 ...
Page 10: ...2 MEASUREMENTS AND ADJUSTMENTS 10 ...
Page 19: ...40 F607V6Z00AP LAMP COVER U 1 19 ...
Page 30: ...30 ...
Page 31: ...7 2 NN H275 APH CPH NN S255 APH CPH 31 ...
Page 32: ...32 ...
Page 33: ...7 3 NN S245 CPH H264 FR APH S254 FR APH 33 ...
Page 34: ...34 ...
Page 35: ...7 4 PARTS LIST 7 4 1 NN P295 APH CPH S255 APH CPH 35 ...
Page 44: ...reserved Unauthorized copying and distribution is a violation of law 2 ...
Page 45: ...3 ...
Page 46: ...4 ...
Page 47: ...5 ...
Page 49: ...3 CONTROL PANEL CPH 7 ...
Page 50: ...4 OPERATION AND DIGITAL PROGRAMMER CIRCUIT TEST PROCEDURE 4 1 To set clock 8 ...
Page 55: ...6 SCHEMATIC DIAGRAM CPH 13 ...
Page 76: ...13 TROUBLESHOOTING GUIDE 34 ...
Page 81: ...13 3 How to check the semiconductors using an OHM meter 14 EXPLODED VIEW AND PARTS LIST 39 ...
Page 89: ...20 DIGITAL PROGRAMMER CIRCUIT SCHEMATIC DIAGRAM 47 ...