20.1. Installation of Safety switch A,
Safety switch B and Short
switch
1. When mounting Safety switch A, Safety switch B and short
switch to door hook assembly, mount the Safety switch A,
Safety switch B and the short switch to the door hook
assembly as shown. (in Figure).
NOTE: No specific adjustment during installation of
Safety switch A, Safety switch B and short switch to the
door hook is necessary.
2. When mounting the door hook assembly to the oven
assembly, adjust the door hook assembly by moving it in
the direction of arrow in (Figure) so that the oven door will
not have any play in it. Check for play in the door by pulling
the door assembly. Make sure that the latch keys move
smoothly after adjustment it completed. Completely tighten
the screws holding the door hook assembly to the oven
assembly.
3. Reconnect the short switch, safety switches A & B and
check the continuity of t monitor circuit and all latch
switches again.
20.2. Measurement of microwave
output
The power output of the magnetron can be determined by
performing IEC standard test procedures. However, due to the
complexity of IEC test procedures, it is recommended to test
the magnetron using the simple method outlined below.
Necessary Equipment:
*1 liter beaker
*Glass thermometer (Celsius scale)
*Wrist watch or stopwatch
NOTE: Check the line voltage under load. Low voltage will
lower
the
magnetron
output.
Take
the
temperature
readings and heating time as accurately as possible.
1. Fill the beaker with exactly one liter of tap water. Stir the
water using the thermometer and record the beaker's
temperature (recorded as T1)
2. Place the beaker on the center of ceramic shelf.
3. Set the one to High power and heat it for exactly one
minute.
4. Stir the water again and read the temperature of the beaker
(recorded as T2). The normal temperature rise (T2-T1) at
High power output for each model is as shown in table.
20 MEASUREMENTS AND ADJUSTMENTS
32
NE-1257R/NE-1257CR / NE-1757R/NE-1757CR / NE-2157R/NE-2157CR / NE-1258R
Summary of Contents for NE-1257CR
Page 4: ...1 OUTLINE DIAGRAM 4 NE 1257R NE 1257CR NE 1757R NE 1757CR NE 2157R NE 2157CR NE 1258R ...
Page 5: ...2 OPERATION PROCEDURE 5 NE 1257R NE 1257CR NE 1757R NE 1757CR NE 2157R NE 2157CR NE 1258 ...
Page 6: ...6 NE 1257R NE 1257CR NE 1757R NE 1757CR NE 2157R NE 2157CR NE 1258R ...
Page 7: ...7 NE 1257R NE 1257CR NE 1757R NE 1757CR NE 2157R NE 2157CR NE 1258 ...
Page 8: ...8 NE 1257R NE 1257CR NE 1757R NE 1757CR NE 2157R NE 2157CR NE 1258R ...
Page 9: ...9 NE 1257R NE 1257CR NE 1757R NE 1757CR NE 2157R NE 2157CR NE 1258 ...
Page 34: ...34 NE 1257R NE 1257CR NE 1757R NE 1757CR NE 2157R NE 2157CR NE 1258R ...
Page 35: ...22 TROUBLESHOOTING GUIDE 35 NE 1257R NE 1257CR NE 1757R NE 1757CR NE 2157R NE 2157CR NE 1258 ...
Page 47: ...47 NE 1257R NE 1257CR NE 1757R NE 1757CR NE 2157R NE 2157CR NE 1258 ...