NA-A47VC5WDE
29
10.24. Tub
1. Remove tub inlet bellow hose loosening the clamp
squeezing it by using a pliers.
2. Remove screw holding EPS reservoir.
3. Remove tub outlet bellowed hose loosening screwed-
clamp.
4. Remove 19 screws around tub using box wrench size 8
mm.
5. Remove front tub.
6. Remove drum.
Summary of Contents for NA-A47VC5WDE
Page 2: ...NA A47VC5WDE 2 1 Safety Precautions ...
Page 4: ...NA A47VC5WDE 4 2 3 Dimensions Dimension in millimetres NA A47VC5 ...
Page 5: ...NA A47VC5WDE 5 3 Location of Controls and Components ...
Page 9: ...NA A47VC5WDE 9 5 2 Programmes 5 2 1 Selecting the Programe Programmauswahl ...
Page 10: ...NA A47VC5WDE 10 5 2 2 Power and Water Consumption Strom und Wasserverbrauch ...
Page 11: ...NA A47VC5WDE 11 5 2 3 Details of Programmes Details von Programmen ...
Page 12: ...NA A47VC5WDE 12 ...
Page 14: ...NA A47VC5WDE 14 ...