24
10.21. Shock Absorber Pin
10.22. Driven Pulley
1
1
Remove shock absorber pins squeezing the ratchet by a
pliers
Remove the belt rotating the driven pulley
10.23. Driven Pulley
1
1
Remove the bolt at the center of pulley by tucking a
wooden bar avoids rotation
Remove pulley
10.24. Motor
1
2
Remove two screws holding motor by using box wrench
Pull motor up
10.25. Tub
1
2
Remove tub inlet bellow hose loosening the clamp
squeezing it by using a pliers
Remove screw holding EPS reservoir
Summary of Contents for NA-127VB6WES
Page 2: ...2 ...
Page 4: ...4 2 3 Dimension in millimetres NA 127VB6 ...
Page 5: ...5 3 Location of Controls and Components ...
Page 9: ...9 5 2 Program Details ...