1. Align phase mark (
Δ
) and rotate the Cam Barrel Unit
4. Tighten 2 screws (G) in numerical order
by using the torque driver with specified torque.
clockwise when you watch it from back.
6.2.2.5. Installation of the 1st Lens Holder and
the Cam Barrel
6.2.2.7. Installation of the Ring Mount Base
Screw Order
① → ② → ③
Torque
10 ± 1 N
・
cm
6.2.2.8. Installation of the Lens P.C.B. Unit and
the Lens Mount Contact Unit
1. Connect FPC of Lens Mount Connect Unit to connector.
3. Install the Zoom Drive Pin.
6.2.2.6. Installation of the Wave Washer
1. Install the Wave Washer.
Torque
10 ± 1 N
・
cm
Screw Order
① → ②
Unit and the Zoom Drive Pin
1. Install the Ring Mount Base.
2. Tighten 3 screws (F) in numerical order
by using the torque driver with specified torque.
2. Installation the Lens P.C.B. Unit and
the Lens Mount Connect Unit.
3. Connect FPCs to 4 connectors of the Lens P.C.B. Unit.
1
5