14.3. Adjustment (Charger Unit)
Items
Adjustment
Point
Procedure
Check or
Replace Parts
(
A
)
Charging Check
-
1. Connect Charge Contact 12
Ω
/2W resistor between and charge-.
2. Measure and confirm voltage across the resistor is 2.7V ± 0.2V.
D1,R1,R2
Note:
After the measuring, sock up the solder of TP.
The connection of adjustment equipment are as shown in
Adjustment Standard (Charger Unit)
(P.51).
14.4. Adjustment Standard (Charger Unit)
When connecting the Simulator Equipments for checking, please refer to below.
14.4.1. Flow Solder Side View
PbF
R1
R2
TP4
TP1
TP2
TP3
Digital Volt Meter
12
Ω
/2W
(A)
Note:
(
A
) is referred to
Adjustment (Charger Unit)
(P.51)
51
KX-TCD445BXS / KX-TCD445BXT / KX-TCD445BXF / KX-A144BXS / KX-A144BXT / KX-A144BXF /