21
EN
English
Installing the Appliance
Wall Mounted
Wall Drilling and Bracket Fixing - Wall Marking:
■
Draw a vertical line on the supporting wall up to the
ceiling, or as high as practical, at the centre of the
area in which the hood will be installed.
■
Draw a horizontal line at 650 mm above the hob.
■
Place the bracket
(Ref.
7.2.1)
on the wall as shown
about 1-2 mm from the ceiling or upper limit aligning
the centre (notch) with the vertical reference line.
■
Mark the wall at the centres of the holes in the
bracket.
■
Place another bracket
(Ref.
7.2.1)
on the wall as
shown at X mm below the first bracket (X = height
of the upper chimney section supplied), aligning the
centre (notch) with the vertical line.
■
Mark the wall at the centres of the holes in the
brackets.
■
Mark a reference point as indicated at 112 mm from
the vertical reference line and 320 mm above the
horizontal reference line.
■
Repeat this operation on the other side.
■
Drill ø 8 mm holes at all the centre points marked.
■
Insert the wall plugs
(Ref.
11)
in the holes.
■
Fix the lower bracket
(Ref.
7.2.1)
using the 2 screws
(Ref.
12a)
supplied.
■
Fix the upper bracket
(Ref.
7.2.1)
and the air outlet
connection support
(Ref.
7.3)
together using the 2
screws
(Ref.
12a)
supplied.
■
Insert the 2 screws
(Ref.
12a)
supplied in the hood
body fixing holes, leaving a gap of 5-6 mm between
the wall and the head of the screw.
650 min.
7.2.1
112
112
11
12a
7.3
320
x
1÷2