8. Auto test
Tests which you chose can be performed collectively only 1 cycle.
8-1. Auto test
If you put the check mark in the boxies each test ahead and click “Execute”, PE Diag start selected
tests collectively automatically.
8-2. Satrt-up test
If you put the check mark in the boxies each test ahead and put the check mark in the box of “Satrt-up
test”, next PE Diag startup timing, PE Diag tests selected tests automatically.
-
3-12
-
Summary of Contents for JS-960 Series
Page 28: ...12 Click here Starting Installation This is process gage 3 3 ...
Page 30: ... 3 5 ...
Page 81: ... 4 40 ...
Page 82: ...4 41 4 1 2 Parts Lo cation ...
Page 83: ... 4 42 ...
Page 84: ...4 43 4 1 3 Replacement Parts List ...
Page 90: ... 4 49 4 2 2 Parts Location ...
Page 91: ... 4 50 4 2 3 Replacement Parts List ...
Page 94: ... 4 53 4 3 2 Parts Location ...
Page 95: ... 4 54 4 3 3 Replacement Parts List ...
Page 98: ... 4 57 4 4 2 Parts Location ...
Page 99: ... 4 58 4 4 3 Replacement Parts List ...
Page 104: ... 4 63 ...
Page 105: ... 4 64 4 5 2 Parts Location ...
Page 106: ... 4 65 4 5 3 Replacement Parts List ...
Page 107: ... 5 1 5 Body Block 5 1 Disassembling Drawing 5 1 1 Main Body Disassembling Drawing ...
Page 108: ... 5 2 ...
Page 109: ... 5 3 5 1 2 LCD Disassembling Drawing ...
Page 110: ... 5 4 ...
Page 111: ... 5 5 5 1 3 Stand Disassembling Drawing ...
Page 112: ... 5 6 5 1 4 Rear Display Disassembling Drawing ...
Page 113: ... 5 7 5 1 5 MSR Disassembling Drawing JS 960MG 020 ...
Page 114: ... 5 8 JS 960MG 010 ...
Page 115: ... 5 9 JS 960FPK010 ...
Page 116: ... 5 10 5 1 6 2nd Display Disassembling Drawing ...
Page 117: ......
Page 140: ...Reserved for future ...