B. During oven operation, input current is approximately less than
0.4A.
INPUT AMPERE FAILURE CODE
Unplug CN701
<0.4A
Oven stops in 3
seconds after
started.
If both a and b are OK, the Inverter Power Supply (U) can be determined OK.
11. MEASUREMENTS AND ADJUSTMENTS
11.1. Adjustment of primary latch switch, secondary latch switch and
short switch.
1. When mounting Primary latch switch,Secondary latch switch and
short switch to door hook assembly, mount the Primary latch switch,
the Secondary latch switch and the short switch to the door hook
assembly as shown in table.
NOTE:
No specific adjustment during installation of Primary latch switch,
Secondary latch switch and short switch to the door hook is
necessary.
2. When mounting the door hook assembly to the oven assembly, adjust
the door hook assembly by moving it in the direction of arrow in the
illustration so that the oven door will not have any play in it. Check for
play in the door by pulling the door assembly. Make sure that the latch
keys move smoothly after adjustment is completed. Completely
tighten the screws holding the door hook assembly to the oven
assembly.
3. Reconnect the short switch and check the continuity of the monitor
30
Summary of Contents for Inverter NN-H275
Page 3: ...3 ...
Page 4: ...4 ...
Page 5: ...5 ...
Page 6: ...1 SCHEMATIC DIAGRAM 1 1 APH NN P295 H275 1 2 APH NN S255 6 ...
Page 7: ...1 3 APH NN H264 FR S254 FR 7 ...
Page 8: ...1 4 CPH NN P295 H275 8 ...
Page 9: ...1 5 CPH NN S255 S245 9 ...
Page 10: ...2 MEASUREMENTS AND ADJUSTMENTS 10 ...
Page 19: ...40 F607V6Z00AP LAMP COVER U 1 19 ...
Page 30: ...30 ...
Page 31: ...7 2 NN H275 APH CPH NN S255 APH CPH 31 ...
Page 32: ...32 ...
Page 33: ...7 3 NN S245 CPH H264 FR APH S254 FR APH 33 ...
Page 34: ...34 ...
Page 35: ...7 4 PARTS LIST 7 4 1 NN P295 APH CPH S255 APH CPH 35 ...
Page 44: ...reserved Unauthorized copying and distribution is a violation of law 2 ...
Page 45: ...3 ...
Page 46: ...4 ...
Page 47: ...5 ...
Page 49: ...3 CONTROL PANEL CPH 7 ...
Page 50: ...4 OPERATION AND DIGITAL PROGRAMMER CIRCUIT TEST PROCEDURE 4 1 To set clock 8 ...
Page 55: ...6 SCHEMATIC DIAGRAM CPH 13 ...
Page 76: ...13 TROUBLESHOOTING GUIDE 34 ...
Page 81: ...13 3 How to check the semiconductors using an OHM meter 14 EXPLODED VIEW AND PARTS LIST 39 ...
Page 89: ...20 DIGITAL PROGRAMMER CIRCUIT SCHEMATIC DIAGRAM 47 ...