PART NAME AND DIMENSIONS
FY-E35PM1
FY-E35PM1L
Internal structure after opening
the inspection cover
Dimension of inspection opening
Internal structure after opening
the inspection cover
Dimension of inspection opening
Cautions for inspection opening
Unit:mm
1. Inspection opening must be reserved on ceiling so that you can perform the routine maintenance for heat exchange core and filter or checking of products.
2. It's available to only reserve the side inspection opening.
3. It's also required to reserve side inspection opening in case bottom inspection opening is reserved.
You can't conduct the maintenance without reservation of side inspection opening.
Impeller
Frame
Adapter
Heat exchange core
Ceiling suspension part
Part name
No.
Quantity
Material
Fan motor
Outdoor filter
Indoor filter
Switch box
Galvanized steel sheet
ABS
PP
Special resin
Nonwoven fabric
Galvanized steel sheet
Galvanized steel sheet
Part name
No.
Quantity
Material
1
2
3
4
5
6
7
8
9
1
4
2
1
2
2
2
4
1